Not even a decade ago, the cost to recast the handmade cement block structures of Frank Lloyd Wright’s Annie Pfeiffer Chapel on the campus of a Florida Southern College was prohibitively expensive.
But today, as 3D printing technology improves and becomes more affordable, the Annie Pfeiffer Chapel was recently restored in precise architectural detail, Design Milk reports.
The chapel was constructed using Wright’s signature textile block building system, utilizing student labor in the years between 1938 to 1941. More than 6,000 tapestry blocks decorated into 46 unique designs were individually cast from coquina and concrete.
Thanks to a $50,000 grant from the Florida Division of Historical Resources and a $350,000 grant provided by the Save America’s Treasurers Program of the National Park Service, the chapel’s splendor was restored. The Florida Southern College reports that by using 3D printers purchased with these grants, restorers were able to create molds for the intricate concrete blocks that were originally constructed by hand.
Consistent with Wright’s original design, 2,000 distinctive colored glass tiles were created and inserted into the manufactured blocks.
Learn more on the chapel’s restoration and see the equipment in action at Florida Southern College news.
Related Stories
| Mar 7, 2012
Firestone iPad app offers touch technology
Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.
| Mar 7, 2012
LEO A DALY opens new office in Riyadh, Saudi Arabia
Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.
| Mar 7, 2012
Turner appointed Batson-Cook CFO and treasurer
Cecil G. Hood to continue in advisory role.
| Mar 7, 2012
Thornton Tomasetti names Dowdall VP of Kansas City office
Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.
| Mar 7, 2012
LEO A DALY selected to design Minnesota Fallen Firefighters Memorial
The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.
| Mar 7, 2012
Houlihan Lokey adds Steffen to Industrials Group
Steffen bolsters group with experience in the building materials and rorest product sectors.
| Mar 6, 2012
Country’s first Green House home for veterans completed
Residences at VA Danville to provide community-centered housing for military veterans.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago
Construction was completed by Skender in just 12 weeks.
| Mar 6, 2012
BLT Architects promotes two to associate
Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.