Owners of buildings in hurricane zones want to minimize damage and get tenants back in their homes or offices as soon as possible after a storm. So the onus is on the Building Team to find, specify, and—when necessary—engineer products and systems to ever-higher standards. The powerful hurricanes of the past 20 years have resulted in more stringent building codes and standards as well as more rigorous product testing.
In Florida, for example, the Miami-Dade County Building Department issues a Notice of Acceptance (NOA) to products only after they’ve passed intensive tests that simulate the effects of high-velocity hurricanes. The Miami–Dade list is a good place to start when selecting products for a building in a hurricane zone, says Bryan Karsky, AIA, LEED AP, executive vice president of Collman & Karsky Architects in Tampa, Fla. “You’re dealing with assemblies and testing that already give you a baseline for the level of hurricane hardening or wind resistance,” says Karsky. But bear in mind that additional engineering will be needed in areas where wind speeds can reach Category 4 (sustained winds of 131 to 155 mph) or Category 5 (sustained winds greater than 155 mph).
Let’s take a look at four building products that have been recently put to the test and approved for use in hurricane zones.
Wellbilt’s Sure-Board Wall Panel
Bilco’s Type S and Type NB steel and aluminum hatches
Related Stories
| Apr 12, 2011
Long-awaited San Francisco center is music to jazz organization’s ears
After 28 years, SFJAZZ is getting its first permanent home. The San Francisco-based nonprofit, which is dedicated to advancing the art of jazz through concerts and educational programs, contracted local design firm Mark Cavagnero Associates and general contractor Hathaway Dinwiddie to create a modern performance center in the city’s Hayes Valley neighborhood
| Apr 12, 2011
Entrance pavilion adds subtle style to Natural History Museum of Los Angeles
A $13 million gift from the Otis Booth Foundation is funding a new entrance pavilion at the Natural History Museum of Los Angeles County. CO Architects, Los Angeles, is designing the frameless structure with an energy-efficient curtain wall, vertical suspension rods, and horizontal knife plates to make it as transparent as possible.
| Apr 12, 2011
BIM Grows Up: Separating Hype from Reality in a 3D World
While BIM adoption still lags in both design and construction, some enterprising owners, architects, and contractors are unlocking the potential of this dynamic technology.
| Apr 12, 2011
Metal cladding: Enhancing design with single-skin panels, MCMs, and IMPs
Single-skin metal panels, metal composite panels, and insulated metal panels can add both aesthetic and functional value to your projects, if you use them correctly.
| Apr 12, 2011
American Institute of Architects announces Guide for Sustainable Projects
AIA Guide for Sustainable Projects to provide design and construction industries with roadmap for working on sustainable projects.
| Apr 11, 2011
Wind turbines to generate power for new UNT football stadium
The University of North Texas has received a $2 million grant from the State Energy Conservation Office to install three wind turbines that will feed the electrical grid and provide power to UNT’s new football stadium.
| Apr 8, 2011
SHW Group appoints Marjorie K. Simmons as CEO
Chairman of the Board Marjorie K. Simmons assumes CEO position, making SHW Group the only firm in the AIA Large Firm Roundtable to appoint a woman to this leadership position
| Apr 5, 2011
Zaha Hadid’s civic center design divides California city
Architect Zaha Hadid is in high demand these days, designing projects in Hong Kong, Milan, and Seoul, not to mention the London Aquatics Center, the swimming arena for the 2012 Olympics. But one of the firm’s smaller clients, the city of Elk Grove, Calif., recently conjured far different kinds of aquatic life when members of the City Council and the public chose words like “squid,” “octopus,” and “starfish” to describe the latest renderings for a proposed civic center.
| Apr 5, 2011
Are architects falling behind on BIM?
A study by the National Building Specification arm of RIBA Enterprises showed that 43% of architects and others in the industry had still not heard of BIM, let alone started using it. It also found that of the 13% of respondents who were using BIM only a third thought they would be using it for most of their projects in a year’s time.