Owners of buildings in hurricane zones want to minimize damage and get tenants back in their homes or offices as soon as possible after a storm. So the onus is on the Building Team to find, specify, and—when necessary—engineer products and systems to ever-higher standards. The powerful hurricanes of the past 20 years have resulted in more stringent building codes and standards as well as more rigorous product testing.
In Florida, for example, the Miami-Dade County Building Department issues a Notice of Acceptance (NOA) to products only after they’ve passed intensive tests that simulate the effects of high-velocity hurricanes. The Miami–Dade list is a good place to start when selecting products for a building in a hurricane zone, says Bryan Karsky, AIA, LEED AP, executive vice president of Collman & Karsky Architects in Tampa, Fla. “You’re dealing with assemblies and testing that already give you a baseline for the level of hurricane hardening or wind resistance,” says Karsky. But bear in mind that additional engineering will be needed in areas where wind speeds can reach Category 4 (sustained winds of 131 to 155 mph) or Category 5 (sustained winds greater than 155 mph).
Let’s take a look at four building products that have been recently put to the test and approved for use in hurricane zones.
Wellbilt’s Sure-Board Wall Panel
Bilco’s Type S and Type NB steel and aluminum hatches
Related Stories
| Apr 2, 2012
Culver joins Sasaki as managing director
Culver will work closely with Sasaki firm leaders on issues of strategy, marketing, and business development.
| Apr 2, 2012
EB-5 investment funds new Miramar, Fla. business complex
Riviera Point Holdings breaks ground on $17 million office center.
| Mar 30, 2012
New windows and doors revitalize older buildings
With their improved aesthetics, energy efficiency, and durability, replacement windows and doors can add significant value to a renovation project.
| Mar 30, 2012
18 handy tablet apps for AEC professionals
Check out these helpful apps for everyday design and construction tasks. Our favorite: MagicPlan, which uses GPS to help you measure and draw a floor plan of any room.
| Mar 29, 2012
U.K.’s Manchester Airport tower constructed in nine days
Time-lapse video shows construction workers on the jobsite for 222 continuous hours.
| Mar 29, 2012
Roller shade operating system wins IF Product Design Award
Design experts in the iF jury recognized the engineering invested in the RB 500 Roller Shade, including a metal clutch with a patented construction, a durable zamac housing with polished finish, and a chain drive unit that excels in maximum operating comfort.
| Mar 29, 2012
Lehigh engineering student wins Thornton Tomasetti Foundation Awards Scholarship
The scholarship is awarded annually to a graduate student in structural engineering deemed by the department to have the potential to make an impact in the field professionally.
| Mar 29, 2012
Construction completed on Las Vegas’ newest performing arts center
The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.
| Mar 29, 2012
Apartments provide permanent housing for California homeless
Gonzalez Goodale Architects designed complex to embrace community and engender sense of pride among residents.
| Mar 28, 2012
40 Under 40, the Class of 2012
Chosen from 223 applicants, these 40 young AEC professionals represent the Class of 2012 in Building Design+Construction’s “40 UNDER 40” competition.