Owners of buildings in hurricane zones want to minimize damage and get tenants back in their homes or offices as soon as possible after a storm. So the onus is on the Building Team to find, specify, and—when necessary—engineer products and systems to ever-higher standards. The powerful hurricanes of the past 20 years have resulted in more stringent building codes and standards as well as more rigorous product testing.
In Florida, for example, the Miami-Dade County Building Department issues a Notice of Acceptance (NOA) to products only after they’ve passed intensive tests that simulate the effects of high-velocity hurricanes. The Miami–Dade list is a good place to start when selecting products for a building in a hurricane zone, says Bryan Karsky, AIA, LEED AP, executive vice president of Collman & Karsky Architects in Tampa, Fla. “You’re dealing with assemblies and testing that already give you a baseline for the level of hurricane hardening or wind resistance,” says Karsky. But bear in mind that additional engineering will be needed in areas where wind speeds can reach Category 4 (sustained winds of 131 to 155 mph) or Category 5 (sustained winds greater than 155 mph).
Let’s take a look at four building products that have been recently put to the test and approved for use in hurricane zones.
Wellbilt’s Sure-Board Wall Panel
Bilco’s Type S and Type NB steel and aluminum hatches
Related Stories
| Aug 11, 2014
The Endless City: Skyscraper concept connects all floors with dual ramps
Rather than superimposing one floor on top of another, London-based SURE Architecture proposes two endless ramps, rising gradually with a low gradient from the ground floor to the sky.
| Aug 11, 2014
Will Alsop's funky 'high-rise on stilts' will be built over an apartment building in London
South London's riverfront will soon be graced by one of Will Alsop's eccentric designs: a curved apartment tower on purple stilts.
| Aug 11, 2014
New guide for prevention of thermal bridging in commercial buildings
The guide aims to overcome obstacles with respect to mitigating thermal bridging to reduce energy consumption in buildings.
| Aug 8, 2014
LEGO launches set aimed at professional architects
LEGO Architecture Studio is made up of 76 unique elements and over 1,200 pieces, and is intended to give the builder as much freedom as possible.
| Aug 8, 2014
First look: China's latest office development will take the shape of binary code
The Window of Guangzhou project will consist of three towers forming the number sequence "001."
| Aug 8, 2014
Government Sector Giants: Public-sector construction slow, but stirring [2014 Giants 300 Report]
Improving energy performance of existing properties through targeted upgrades and large-scale reconstruction continues to be a federal priority, according to BD+C's 2014 Giants 300 Report.
Sponsored | | Aug 8, 2014
Setting guidelines for construction PDF documents across the AEC industry
Sasha Reed interviews two members of the coalition responsible for creating new Guidelines for Construction PDF Documents. SPONSORED CONTENT
Sponsored | | Aug 8, 2014
Safe and secure: Fire and security glazing solution for Plaquemines Parish Detention Center
When the designers at L. R. Kimball looked for an all-in-one clear, wire-free glazing solution that protects against fire, bullets and forced entry for the new Plaquemines Parish Detention Center, SAFTI FIRST supplied a complete single-source tested and listed assembly that was easy to install and maintenance-free.
| Aug 7, 2014
Office Sector Giants: ‘Flex’ reigns supreme in hot office construction market [2014 BD+C Giants 300 Report]
The adage “doing more with less” has become a byword for many businesses since the Great Recession, and clients are trying to maximize every precious inch, according to BD+C's 2014 Giants 300 Report.
| Aug 6, 2014
BIG reinvents the zoo with its 'Zootopia' natural habitat concept [slideshow]
Bjarke Ingels’ firm is looking to improve the 1960s-designed Givskund Zoo in Denmark by giving the animals a freer range to roam.