flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Foster + Partners reveals plans for London residential towers

Foster + Partners reveals plans for London residential towers

At 41 and 36 stories, towers would be significantly taller than any other buildings in the surrounding City Road area.


By De Zeen | May 21, 2013

 

British firm Foster + Partners has unveiled plans for two residential skyscrapers as part of a mixed-use development in north London.

The skyscrapers will form part of a cluster of residential towers proposed for the City Road area in Islington, including Dutch firm UNStudio's Canaletto building and another proposed by US architects SOM.

The 250 City Road project, led by property developers Berkeley Group, proposes the redevelopment of a 1.9 hectare site currently occupied by a cluster of commercial buildings.

Foster + Partners' plans include 800 homes across two towers, which, at 41 and 36 stories in height, would be significantly taller than any other buildings in the surrounding area.

Additional buildings containing shops, cafes, restaurants and a community space would be arranged around a central public park and courtyard garden (below).

Berkeley Group initially employed London practice DSDHA to explore the potential of the site before a public consultation in July last year, after which the project was handed over to Foster + Partners.

 

The project team, which includes landscape architects Gillespies, has now submitted the planning application to the local council.

 

Elsewhere in London, Foster + Partners recently received planning permission for three residential towers on the south side of the river Thames near Lambeth Bridge (below).

The firm also recently completed a new gallery wing clad with golden pipes at the Lenbachhaus art museum in Munich and an airport terminal under a canopy of domes in Jordan.

 

(http://www.dezeen.com/2013/05/15/foster-partners-reveals-plans-for-two-london-skyscrapers/)

Related Stories

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

boombox1
boombox2
native1

More In Category


Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021