British firm Foster + Partners has unveiled plans for two residential skyscrapers as part of a mixed-use development in north London.
The skyscrapers will form part of a cluster of residential towers proposed for the City Road area in Islington, including Dutch firm UNStudio's Canaletto building and another proposed by US architects SOM.
The 250 City Road project, led by property developers Berkeley Group, proposes the redevelopment of a 1.9 hectare site currently occupied by a cluster of commercial buildings.
Foster + Partners' plans include 800 homes across two towers, which, at 41 and 36 stories in height, would be significantly taller than any other buildings in the surrounding area.
Additional buildings containing shops, cafes, restaurants and a community space would be arranged around a central public park and courtyard garden (below).
Berkeley Group initially employed London practice DSDHA to explore the potential of the site before a public consultation in July last year, after which the project was handed over to Foster + Partners.
The project team, which includes landscape architects Gillespies, has now submitted the planning application to the local council.
Elsewhere in London, Foster + Partners recently received planning permission for three residential towers on the south side of the river Thames near Lambeth Bridge (below).
The firm also recently completed a new gallery wing clad with golden pipes at the Lenbachhaus art museum in Munich and an airport terminal under a canopy of domes in Jordan.
(http://www.dezeen.com/2013/05/15/foster-partners-reveals-plans-for-two-london-skyscrapers/)
Related Stories
| Jul 19, 2013
Top BIM Construction Firms [2013 Giants 300 Report]
Turner, Clark Group, DPR top Building Design+Construction's 2013 ranking of the contractors and construction management firms with the most revenue from BIM-driven projects.
| Jul 19, 2013
Top BIM Engineering Firms [2013 Giants 300 Report]
Jacobs, URS, SAIC top Building Design+Construction's 2013 ranking of the engineering and engineering/architecture firms with the most revenue from BIM-driven projects.
| Jul 19, 2013
Top BIM Architecture Firms [2013 Giants 300 Report]
Gensler, HOK, HDR top Building Design+Construction's 2013 ranking of the architecture and architecture/engineering firms with the most revenue from BIM-driven projects.
| Jul 19, 2013
BIM 2.0: AEC firms share their vision for the great leap forward in BIM/VDC implementation [2013 Giants 300 Report]
We reached out to dozens of AEC firms that made our annual BIM Giants lists and asked one simple question: What does BIM 2.0 look like to you? Here’s what they had to offer.
| Jul 19, 2013
Reconstruction Sector Construction Firms [2013 Giants 300 Report]
Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Engineering Firms [2013 Giants 300 Report]
URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Architecture Firms [2013 Giants 300 Report]
Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.
| Jul 19, 2013
Best in brick: 7 stunning building façades made with brick [slideshow]
The Brick Industry Association named the winners of its 2013 Brick in Architecture Awards. Here are seven winning projects that caught our eye.
| Jul 19, 2013
Construction lags other sectors, but momentum is building: JLL report
Although the construction recovery continues to lag other sectors as well as the overall U.S. economy, the industry is finally seeing a rebound. Commercial real estate giant Jones Lang LaSalle recently released its Summer 2013 Construction Highlights report, which found that there are some sectors (such as energy and high-tech) driving demand for construction, while a few major cities are starting to record increased levels of speculative office building developments.
| Jul 19, 2013
Must see: 220 years of development on Capitol Hill in one snazzy 3D flyover video
The Architect of the Capitol this week released a dramatic video timeline of 220 years of building development on Capitol Hill.