flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Foster + Partners to Design New 425 Park Avenue Tower

Foster + Partners to Design New 425 Park Avenue Tower

Conceptual designs submitted by Foster, Hadid, Koolhaas and Rogers to be on exhibit during Municipal Art Society’s Annual Symposium


By Posted by Raissa Rocha, Associate Editor | October 10, 2012

A partnership between L&L Holding Co. and Lehman Brothers Holdings Inc. (LBHI) announced the selection of Foster + Partners, led by Pritzker Prize-winning architect Lord Norman Foster, to design an iconic 650,000-sf office tower to be constructed at 425 Park Avenue in the famed Plaza District of Manhattan. The firm will work with the partnership to create an enduring landmark that befits its exclusive location yet is also of its current time and place.

Foster + Partners was selected at the conclusion of an international architects competition, a six-month process involving many of the world’s most acclaimed architecture firms.  In addition to Foster + Partners, the partnership selected Rogers, Stirk, Harbour + Partners (Lord Richard Rogers), OMA (Rem Koolhaas) and Zaha Hadid Architects to participate in the final, conceptual design phase of the competition over the recent summer.

L&L Holding Chairman and CEO David Levinson also announced that he and Lord Foster will make a presentation on the conceptual design during the Municipal Arts Society’s 3rd Annual Summit for New York City on Oct. 19.  The two-day summit, which starts Oct. 18, will also feature an exhibit featuring the 425 Park Avenue design concepts that were presented by each of the four finalists in the competition. 

“We are grateful to each of the firms for the thoughtfulness and creativity they demonstrated throughout the process,” said Levinson. “There is no doubt that each group was fully capable of helping us realize our vision of a 425 Park Avenue tower that redefines the modern office environment while also respecting and enhancing the timeless allure of the Plaza district.”

Levinson added, “We are looking forward to beginning a process in which we translate Foster’s brilliant concept into a modern tower which offers its inhabitants the most functional and environmentally sustainable work environment imaginable, while also addressing the public realm in a way that hasn’t been accomplished in many years.”

Located in the heart of New York’s famed Plaza District, 425 Park Avenue will be the first full-block office development on this historic stretch in nearly half a century.  The tower will be situated along Park Avenue’s double-wide boulevard with its attractive green medians, modern art exhibits and broad sidewalks.  The district is also recognized as an epicenter of architectural excellence, as exemplified by the nearby Seagram Building and Lever House, which are two of only five structures in New York City to have won AIA’s esteemed “25 Year Award.”  

Foster + Partners views the project as an outstanding opportunity to contribute to the existing character of Park Avenue while also responding to the scale and datum of the boulevard and neighboring buildings. Clearly expressing the geometry of its structure, Foster + Partners’ conceptual design features a tapered steel-frame tower rising to meet three illuminated shear walls, adding to the vibrant New York City skyline. The conceptual design also calls for an elegant façade that seamlessly integrates with the innovative internal arrangement that allows for three gradated tiers of column-free floors.

Offering world-class sustainable office accommodation, Foster + Partners envisions a new tower that anticipates changing needs in the workplace with large, open spaces that encompass flexible use. Each of the three tiers – low, medium and high-rise – is defined by a landscaped terrace that would provide excellent amenity for tenants and offer panoramic views across Manhattan and Central Park. At street level, the conceptual design for 425 Park Avenue gives as much to the city as to the people that will work in it with the potential for a large civic plaza marked by significant works of art.

The conceptual design will serve as the framework for a two-year collaborative process with L&L Holding’s project team to create a fully formed architectural and construction plan for the 425 Park Avenue tower. L&L Holding anticipates the start of construction in 2015, with the new 425 Park Avenue tower to be completed by the end of 2017.

Related Stories

University Buildings | May 10, 2024

UNC Chapel Hill’s new medical education building offers seminar rooms and midsize classrooms—and notably, no lecture halls

The University of North Carolina at Chapel Hill has unveiled a new medical education building, Roper Hall. Designed by The S/L/A/M Collaborative (SLAM) and Flad Architects, the UNC School of Medicine’s new building intends to train new generations of physicians through dynamic and active modes of learning.

Sustainability | May 10, 2024

Perkins&Will’s first ESG report discloses operational performance data across key metrics

Perkins&Will recently released its first ESG report that discloses the firm’s operational performance data across key metrics and assesses its strengths and opportunities.

MFPRO+ News | May 10, 2024

HUD strengthens flood protection rules for new and rebuilt residential buildings

The U.S. Department of Housing and Urban Development (HUD) issued more stringent flood protection requirements for new and rebuilt homes that are developed with, or financed with, federal funds. The rule strengthens standards by increasing elevations and flood-proofing requirements of new properties in areas at risk of flooding. 

Government Buildings | May 10, 2024

New federal buildings must be all-electric by 2030

A new Biden Administration rule bans the use of fossil fuels in new federal buildings beginning in 2030. The announcement came despite longstanding opposition to the rule by the natural gas industry. 

Sustainable Development | May 10, 2024

Nature as the city: Why it’s time for a new framework to guide development

NBBJ leaders Jonathan Ward and Margaret Montgomery explore five inspirational ideas they are actively integrating into projects to ensure more healthy, natural cities.

Mass Timber | May 8, 2024

Portland's Timberview VIII mass timber multifamily development will offer more than 100 affordable units

An eight-story, 72,000-sf mass timber apartment building in Portland, Ore., topped out this winter and will soon offer over 100 affordable units. The structure is the tallest affordable housing mass timber building and the first Type IV-C affordable housing building in the city. 

Architects | May 8, 2024

Ivan O’Garro, AIA joins LEO A DALY as a vice president

Integrated design firm LEO A DALY welcomes Ivan O’Garro, AIA, as a vice president and managing principal of its Atlanta studio.

K-12 Schools | May 7, 2024

World's first K-12 school to achieve both LEED for Schools Platinum and WELL Platinum

A new K-12 school in Washington, D.C., is the first school in the world to achieve both LEED for Schools Platinum and WELL Platinum, according to its architect, Perkins Eastman. The John Lewis Elementary School is also the first school in the District of Columbia designed to achieve net-zero energy (NZE). 

Healthcare Facilities | May 6, 2024

Hospital construction costs for 2024

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

Biophilic Design | May 6, 2024

The benefits of biophilic design in the built environment

Biophilic design in the built environment supports the health and wellbeing of individuals, as they spend most of their time indoors.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021