flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion

Healthcare Facilities

Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion

Mayo Clinic’s main campus redesign includes two nine-story clinical buildings featuring double-height winter gardens and a skybridge.


By Peter Fabris, Contributing Editor  | April 3, 2024
Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion in Rochester, Minn.
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research

A redesign of the Mayo Clinic’s downtown campus in Rochester, Minn., centers around two new clinical high-rise buildings. The two nine-story structures will reach a height of 221 feet, with the potential to expand to 420 feet. Part of a multiyear strategic initiative, the two towers feature a skybridge that horizontally links them with the existing Gonda Building, allowing staff to traverse the site efficiently.

The skybridge is an integral part of a double-height social amenity level that will provide patients and loved ones with space to rest, connect, and recharge. This level will be clearly visible on the building’s façade, making it easy to locate from any part of the campus.

The design creates a new central point of arrival, with the north and south drop-offs converging at a unified main entrance. The existing Gonda Lobby will extend into the new facilities, simplifying wayfinding and creating a welcoming environment from the moment of arrival. 

The design creates adjacencies in dynamic care “neighborhoods” that will streamline the patient experience. These community-centered neighborhoods will fuse services around patient needs and specific diseases, creating continuous care environments that will serve as patients’ homes while at the clinic.

Double-height winter gardens will be located at the center of care neighborhoods, uniting them, and providing light-filled spaces with spectacular views of the city. The atriums are both social and functional, providing opportunities for new forms of respite and healing or collaboration and care. 

A universal grid along with generous floor-to-floor heights will allow clinical spaces to change over time and respond as healthcare continues to evolve. Care environments will be served behind the scenes by highly flexible technological infrastructure containing mechanical, data, and robotic delivery systems that support pioneering treatments while allowing prioritization of human connections. 

Seamless integration of digital capabilities blurs traditional distinctions between inpatient, outpatient, and virtual care to support patients throughout their healthcare journey.

“This is a revolutionary moment for medical care and a complete rethinking of the traditional hospital building as we know it offering maximum flexibility for future needs, while ensuring that the interest of the patient remains at the heart of their healthcare,” says Norman Foster, founder and executive chairman, Foster + Partners. “Our design centers on natural light, views and connections with nature to facilitate new breakthroughs and help deliver the highest level of care with warmth and compassion.”

On the project team:
Owner: Mayo Clinic
Architects: Foster + Partners; CannonDesign
Engineers: CannonDesign is Engineer of Record. Burns and McDonnell is engineer of record for central plant upgrades, site electrical, and thermal utilities.
General Contractor: Gilbane Building Company

Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research
Rendering: Dbox/Foster + Partners © 2023, courtesy Mayo Foundation for Medical Education and Research

 

Related Stories

| Aug 29, 2012

BOND completes South Cove Community Health Center

$11 million, 21,000 square foot community health center opens in Quincy, Mass.

| Aug 24, 2012

KLMK Group forms strategic alliance with Taylor Construction Management

KLMK's expertise in the capital delivery process and TCM's global platform combine to provide an integrated solution with an unparalleled impact for health care related industries.

| Aug 24, 2012

Study predicts how health economic, delivery and buildings play a role in the next decade

Study also finds accountable care organizations, pay-for-performance and aging population will have greatest impact over next five years.

| Aug 9, 2012

DSGW Architects welcomes new employees

Three new employees located in DSGW's Duluth office.

| Aug 7, 2012

McCarthy tops out LEED Platinum-designed UCSD Health Sciences Biomedical Research Facility

New laboratory will enable UCSD to recruit and accommodate preeminent faculty.

| Jul 25, 2012

EwingCole adds healthcare director to D.C. office

Schultz brings over 25 years of proven experience in planning and designing healthcare, medical research, and government medical facilities.

| Jul 25, 2012

Hill International selected as project manager for two Abu Dhabi hospitals

The two hospitals have a combined estimated project value of approximately AED 784 million ($213 million).

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

3 important trends in hospital design that Healthcare Giants are watching closely

BD+C’s Giants 300 reveals top AEC firms in the healthcare sector.

| Jul 19, 2012

Construction begins on military centers to treat TBI and PTS

First two of several centers to be built in Fort Belvoir, Va. and Camp Lejeune, N.C.

boombox1
boombox2
native1

More In Category




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021