flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FORTIFIED resiliency standard expanded to include multifamily sector

Codes and Standards

FORTIFIED resiliency standard expanded to include multifamily sector

Voluntary, beyond-code program aims to protect buildings from severe weather.


By Peter Fabris, Contributing Editor | February 15, 2022
Multifamily towers

Courtesy Pixabay

The Insurance Institute for Business & Home Safety (IBHS) expanded FORTIFIED, a voluntary, beyond-code, resilient construction program, to include the multifamily sector. The standard is geared to homes built or retrofitted to perform better in severe weather, including powerful high winds and heavy rain from thunderstorms, derechos, hurricanes, and tornadoes.

IBHS says it will offer its FORTIFIED Home certification courses for free to nonprofit organizations building homes for families with low to moderate incomes. It will also eliminate the small administrative fee it collects to review and process FORTIFIED designations for single-family homes built by nonprofit organizations for families with low to moderate incomes.

In addition, IBHS will advance research-based affordable resilience solutions, including guidance on ways to make manufactured and modular homes more resilient through public policy initiatives. The organization will continue to collaborate with insurance companies, federal, state, local, and tribal entities, nonprofits, and others who build or have a shared interest in resilient homes and strengthened communities.

To achieve certification, builders and contractors must adhere to strict construction standards developed by IBHS to minimize damage from severe weather. Key resiliency features must be verified and documented by an independent, third-party evaluator.

Related Stories

Codes and Standards | Apr 18, 2016

ASHRAE releases proposed energy standard for historic buildings

Designed to balance with preservation requirements.  

Codes and Standards | Apr 13, 2016

Canadian city fines itself for failing to get a building permit for building renovation

Guelph, Ontario, will pay a $1,125 fine to the province.

Codes and Standards | Apr 12, 2016

Construction trade groups sue OSHA over silica rule

Cite concerns about technological and economic feasibility.

Wood | Apr 8, 2016

New LEED Pilot ACP designed to help eliminate irresponsibly sourced materials

Illegal wood is primary target to restrict illicit material in the supply chain.  

Lighting | Apr 5, 2016

Lighting requirements for high-rise dwellings proposed for energy standard

The requirements would effectively eliminate incandescent and halogen bulbs.

Steel Buildings | Apr 4, 2016

AISI publishes Cold-Formed Steel Framing Design Guide, 2016 Edition

Updates 2007 edition; includes five comprehensive design examples.  

Data Centers | Apr 1, 2016

ASHRAE releases publication on the impact of IT equipment on data center design

The book offers advice for designing structures in the fast-changing data center industry.

Codes and Standards | Mar 28, 2016

Occupant egress simulations that impact codes fall short, researchers say

Building evacuations in emergencies are too dangerous as a result.  

School Construction | Mar 28, 2016

National report on school buildings reports $46 billion annual funding shortfall

Millions of students said to be learning in obsolete facilities.  

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021