flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Former elementary school becomes modern office space in North Charleston

Office Buildings

Former elementary school becomes modern office space in North Charleston

The Middleton Group is designing the project.


By David Malone, Associate Editor | November 17, 2020
Ten Mile entrance

All images: The Middleton Group

Construction has begun on Ten Mile on Rivers, a 23,000-sf adaptive reuse project in North Charleston.

The project takes a former elementary school built in phases in the 1950s and 1960s and transforms it into 60s-inspired leasable modern office spaces. The space includes 200-sf single executive offices, small- and medium-sized suites, and the ability to combine contiguous spaces up to 12,000 sf.

 

Ten Mile Bathroom

 

The overall design of the project incorporates a mid-century modern style with a refreshed facade that introduces new entry elements that infuse a modern design aesthetic in the plain brick building. The interior will feature light-filled spaces with pops of color and textures inspired by the 1960s.

The renovation also includes a new roof and full MEP replacement and the addition of a new 175-space parking lot, which will preserve the 27 grand oak trees that exist onsite. Construction is slated for completion in spring of 2021.

 

Ten Mile Interior

Related Stories

Office Buildings | Jul 25, 2018

New study on occupant comfort advances Saint Gobain’s design approach for renovation and new construction

The building products giant gauges its employees’ perceptions of old and new headquarters environments.

Office Buildings | Jul 18, 2018

A day in the life of an ‘agile worker’

When our Gensler La Crosse office relocated last year, we leveraged the opportunity to support an agile workplace strategy (aka, no assigned seating). Here’s what I’ve experienced firsthand.

Office Buildings | Jul 17, 2018

Transwestern report: Office buildings near transit earn 65% higher lease rates

Analysis of 15 major metros shows the average rent in central business districts was $43.48/sf for transit-accessible buildings versus $26.01/sf for car-dependent buildings.

Office Buildings | Jun 18, 2018

Cube-shaped AmorePacific headquarters building completes construction in Seoul

The David Chipperfield Architects-designed project began in 2010.

Office Buildings | Jun 15, 2018

Portland’s newest office buildings put nature on center stage

Hacker Architects designed the space for Portland’s Frontside District.

Office Buildings | Jun 11, 2018

Online travel company moves to the 66th floor of the Empire State Building

The new headquarters includes almost 20,000 sf of additional space.

Office Buildings | Jun 6, 2018

Final Cut: Jupiter Entertainment’s new production studio in New York combines office and editing spaces

The project team completed this full-floor renovation in four months.

Office Buildings | May 31, 2018

EarthCam Headquarters features a 25-foot-tall video portal entrance

Watch a time-lapse of the HQ being built from groundbreaking to grand opening.

| May 30, 2018

Accelerate Live! talk: T3 mass timber office buildings

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), architect and mass timber design expert Steve Cavanaugh tells the story behind the nation’s newest—and largest—mass timber building: T3 in Minneapolis.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021