flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FMI releases Adjust, Adapt, Act Study

FMI releases Adjust, Adapt, Act Study


By By BD+C Staff | October 24, 2011
The article also summarizes thoughts and insight from senior FMI strategy experts on success strategies that have become crucial

FMI, the largest provider of management consulting and investment banking to the engineering and construction industry, releases its newest study "Adjust, Adapt, Act: Winning Stories From the Post-2007 Construction Industry."

The paper explores several case studies, including Sun Country Builders, Huen, BakerTriangle, Consigli, Skender Construction and Flatiron, and distills the key factors that make these companies unique and successful. The article also summarizes thoughts and insight from senior FMI strategy experts on success strategies that have become crucial in running a profitable construction business, as well as common mistakes, which can lead to failure in today's cutthroat environment.

Select success strategies discussed in the paper include:

  • Get into the heads of your clients – early
  • Reinvent yourself and innovate. Find what makes you unique
  • Be smart about diversifying your portfolio
  • Be nimble and flexible, yet disciplined. Never get complacent
  • Understand "incremental economics" – revenue, margin, overhead – more than ever
  • Bring creative financing solutions to the table
  • Build contingency plans into all corporate strategy discussions and never stop looking ahead.

Key highlights include:

  • Case studies on successful companies
  • Business imperatives for a volatile economy – thoughts and insight from FMI consultants and study participants
  • Common mistakes – summary of most frequent strategic mistakes witnessed by FMI consultants
  • Conclusion and recommendations

To download a copy of the full report, click here. For reprint permission or to schedule an interview with the author, please contact Sarah Vizard at 919.785.9221. BD+C

Related Stories

| Jun 11, 2012

Reed Construction announces new hire and promotion

Reed Construction hired Augie Insalaco as a project manager and promoted Matt Mahoney from project intern to project engineer.

| Jun 11, 2012

Hill International selected as CM for Porto Arabia Towers in Qatar

The complex is a mixed-use development featuring both residential and commercial properties.

| Jun 8, 2012

Living Building Challenge wins the 2012 Buckminster Fuller Challenge

The Living Building Challenge was chosen from a pool of 122 of entries from around the world.

| Jun 8, 2012

Nauset Construction completing sustainable dorm for Brooks School

Student input on green elements provides learning experience.

| Jun 8, 2012

Skyline Construction names Millitello president

Millitello is a 31-year veteran who has overseen the construction of campus-size projects.

| Jun 8, 2012

Allsteel names Kris Yates to head architectural products group

Yates is responsible for the start up, launch and ongoing sales and marketing of Allsteel’s new Beyond movable walls.

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

boombox1
boombox2
native1

More In Category




Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021