FMI released the first-quarter 2012 Construction Outlook Report forecasting a 5% increase in total construction put in place for 2012 compared to 2011, or $826.3 billion. The last time construction put in place was at this level was 2000-2001.
Despite slow growth projections and rising gasoline prices, the GDP is still growing and consumers are still spending, reflected in the Conference Board's Consumer Confidence Index increasing to 70.8 in February compared to 70.4 a year ago. Along with the Federal Reserve's intervention, these factors have served to keep growth slow and inflation in check.
In order for residential construction to achieve the 8 percent increase projected and top $264.4 billion in 2012, a number of factors still have to fall into place:
- Reduction in the current inventory of homes
- Lenders willing to lend on reasonable terms
- Steady improvement in hiring
Projections indicate a 4% increase in nonresidential buildings for 2012, topping $341 billion, with slightly higher growth in 2013 to $361 billion. Nonresidential contractors are facing many of the same problems as residential contractors. In addition, competition is fierce, with low price still the name of the game. Project owners who are ready to restart their building programs are expecting hungry contractors to submit very low bids. One of the keys for growth will be the return of private investment in construction. Additionally, federal, state and local government construction have been dialed back until budgets are in better repair and tax revenues return to levels that are more normal. Research indicates that there are signs this is starting to happen. BD+C
Related Stories
| Apr 6, 2012
Perkins Eastman unveils Qatar mixed-use sports complex
Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.
| Apr 5, 2012
5 tips for a successful door and window retrofit
An exclusive tip sheet to help the Building Team manage door and window retrofits successfully.
| Apr 4, 2012
Educational facilities see long-term benefits of fiber cement cladding
Illumination panels made for a trouble-free, quick installation at a cost-effective price.
| Apr 4, 2012
HDS designs Mount Auburn Hospital’s new healthcare center in Waltham, Mass.
HDS Architecture provided design services for all the Mount Auburn Healthcare suites including coordination of HVAC and FP engineering.
| Apr 4, 2012
Bald joins the Harmon glazing team
Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 4, 2012
San Antonio animal hospital earns LEED Platinum certification
Middleman Construction Company builds the city?s first commercial building to earn certification.
| Apr 4, 2012
Hason joins RNL’s as MENA regional director
Hason specializes in planning and urban design, hospitality, office, corporate headquarters and transportation structures, as well as, higher education and museum facilities.
| Apr 3, 2012
Product Solutions
Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.