flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FMI: Nonresidential construction in a slowdown, according to latest NRCI score

Contractors

FMI: Nonresidential construction in a slowdown, according to latest NRCI score

“Economic recovery momentum is losing steam and rising costs in labor and materials start to put a load on the industry,” said Chris Daum, President and CEO of FMI.


By BD+C Staff | December 2, 2015
FMI: Nonresidential construction in a slowdown, according to latest NRCI score

Photo: Pioneer Library System/Creative Commons

The FMI Nonresidential Construction Index Report (NRCI) for Q4 2015 says that nonresidential construction is experiencing a slowdown. The NRCI dropped four points to 59.5, the lowest score since Q4 in 2013.

Panelists displayed a declining outlook for the overall economy, which was down 12.3 points to 58.3 from Q3. The report found that the expectations of activity in economic sector and the expected change in backlog scores also fell, and the cost of construction material rose.

“Economic recovery momentum is losing steam and rising costs in labor and materials start to put a load on the industry,” Chris Daum, President and CEO of FMI, said in a statement. “Next year will likely be more challenging for industry growth than 2015. Firms that excel at recruiting and training the most skilled workforce will have a strategic edge in the marketplace.”

Key takeaways in the Q4 NRCI:
· The overall economy where panelists do business is down. Panelists’ business is slowing down with a grim outlook of the overall economy.
· Panelists’ construction business is slipping. Although the panelists’ expectation of their construction activities slipped by 5.8 points to 69.9, it shows residual recovery momentum.
· There is an expected drop in backlog. The measure of expected change in backlog dropped to 62.2 from last quarter’s 68.2, a median of the past 12 months.
· The cost of construction materials and labor is rising. The cost of labor and materials continues to go higher. Generally, it is expected that costs will rise as business improves, thus holding down the overall NRCI index number.

Related Stories

| Aug 30, 2013

Local Government Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.  

| Aug 30, 2013

A new approach to post-occupancy evaluations

As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects. 

| Aug 29, 2013

First look: K-State's Bill Snyder Family Stadium expansion

The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history. 

| Aug 29, 2013

McCownGordon Construction plans Kansas office

In response to business growth and client demand, McCownGordon Construction of Kansas City announced today it is opening an office in the State of Kansas located in Manhattan, Kan.

| Aug 27, 2013

Industrial Sector Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2013 Giants 300 Report.

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 26, 2013

Chicago Bears kick off season at renovated Halas Hall

An upgraded locker room, expanded weight room, and updated dining room with an outdoor patio greeted the Chicago Bears when they arrived at Halas Hall for practice this month. The improvements are part of a major expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., completed by Mortenson Construction in less than seven months.

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 22, 2013

Warehouse remake: Conversion project turns derelict freight terminal into modern office space [slideshow]

The goal of the Freight development is to attract businesses to an abandoned industrial zone north of downtown Denver.

| Aug 21, 2013

First look: Petersen Automotive Museum's dramatic facelift

One of the world's largest automotive museums unveils plans for a stunning, sculptured metal exterior and cutting-edge interior upgrades. 

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021