flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Florida gives developers more time to install first responder radio signal systems

Codes and Standards

Florida gives developers more time to install first responder radio signal systems

Expensive upgrades can be postponed for several years.


By Peter Fabris, Contributing Editor | April 27, 2016
Florida gives developers more time to install first responder radio signal systems

Photo: Phillip Pessar/Creative Commons.

New Florida building code legislation will allow building owners to postpone for several years a requirement for all new and existing buildings to provide minimum radio signal strength for fire department communications.

The code change that requires installation of necessary equipment and wiring in most commercial and multi-family buildings was to go into effect immediately, with no grace period. The provision, which necessitates opening up sections of walls and ceilings, has been estimated to cost over $1 million for some large structures.

A recently enacted update to the legislation provides for existing non-residential buildings to install the radio enhancement systems by Jan. 1, 2022, if owners submit their application for the installation permit by Dec. 31, 2019. Existing apartment buildings (including residential condominiums) are not required to install radio enhancement systems until Jan. 1, 2025, if they apply for the appropriate permits by Dec. 31, 2022.

The legislation now allows unit owner associations to stretch out special assessments over a number of years.

Related Stories

| Sep 5, 2013

Construction industry groups create coalition to respond to new OSHA silica rule

A group of 11 construction trade associations has created the Construction Industry Safety Coalition in response to the Occupational Safety and Health Administration’s (OSHA) proposed rule on silica for the construction industry.

| Sep 5, 2013

Red tape delays California county jail construction projects

California authorized $1.2 billion for jail construction in 2007, but not a single county in the state has completed a jail project since then.

| Sep 5, 2013

New CM-at-risk and design-build options create controversy in Ohio

Some contractors say Ohio's new system puts small and midsize construction companies at a disadvantage.

| Sep 5, 2013

Outdated codes slowed disaster recovery in Tuscaloosa, Ala.

Outdated building codes and lack of a master plan slowed the initial rebuilding stage after a devastating tornado leveled parts of Tuscaloosa, Ala. in 2011, according to the city’s mayor.

| Aug 28, 2013

Building collapse prompts legislation to beef up demolition regulations in Philadelphia

Philadelphia City Council will introduce legislation next month to strengthen the regulation of building demolition practices.

| Aug 28, 2013

Rules requiring contractors to boost hiring of veterans criticized

Some businesses are pushing back against proposed rules requiring federal contractors to step up their hiring of returning military service personnel.

| Aug 28, 2013

OSHA moves to reduced exposure to crystalline silica

Under a proposal from the Occupational Safety and Health Administration, the new permissible exposure limit to crystalline silica per cubic meter of air could be changed from 250 micrograms to 50 micrograms.

| Aug 28, 2013

IPMSC chooses members of committee for global property measurement standard

The International Property Measurement Standards Coalition (IPMSC) has selected 19 real estate experts from around the world to join its Standards Setting Committee to develop a global standard for measuring property.

| Aug 20, 2013

Code amendment in Dallas would limit building exterior reflectivity

The Dallas City Council is expected to vote soon on a proposed code amendment that would limit a building’s exterior reflectivity of “visible light” to 15%. 

| Aug 20, 2013

Developers of Hollywood skyscraper will dig to see if earthquake fault is on site

New York-based Millennium Partners have agreed to dig a trench on a Hollywood, Calif., property to help determine whether an earthquake fault runs under it.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021