flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Florida gives developers more time to install first responder radio signal systems

Codes and Standards

Florida gives developers more time to install first responder radio signal systems

Expensive upgrades can be postponed for several years.


By Peter Fabris, Contributing Editor | April 27, 2016
Florida gives developers more time to install first responder radio signal systems

Photo: Phillip Pessar/Creative Commons.

New Florida building code legislation will allow building owners to postpone for several years a requirement for all new and existing buildings to provide minimum radio signal strength for fire department communications.

The code change that requires installation of necessary equipment and wiring in most commercial and multi-family buildings was to go into effect immediately, with no grace period. The provision, which necessitates opening up sections of walls and ceilings, has been estimated to cost over $1 million for some large structures.

A recently enacted update to the legislation provides for existing non-residential buildings to install the radio enhancement systems by Jan. 1, 2022, if owners submit their application for the installation permit by Dec. 31, 2019. Existing apartment buildings (including residential condominiums) are not required to install radio enhancement systems until Jan. 1, 2025, if they apply for the appropriate permits by Dec. 31, 2022.

The legislation now allows unit owner associations to stretch out special assessments over a number of years.

Related Stories

Codes and Standards | Jun 29, 2017

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Reports suggest an extra $6,300 for fire-resistant cladding could have prevented the tragedy.

Codes and Standards | Jun 28, 2017

Minimum Design Loads and Associated Criteria for Buildings and Other Structures, Standards ASCE/SEI 7-16, has been updated

The document is used for determining design loads including dead, live, soil, flood, tsunami, snow, rain, atmospheric ice, earthquake, wind, and fire.

Codes and Standards | Jun 27, 2017

Cold-formed steel framing engineering guide for building projects released

Better sound attenuation for subfloors and exterior continuous insulation are among the matters addressed.

Codes and Standards | Jun 26, 2017

L.A.’s new ordinance requires energy and water efficiency benchmarking

Structures 20,000 sf and larger must demonstrate steps to boost efficiency.

Codes and Standards | Jun 21, 2017

World Green Building Council: All buildings must be net zero by 2050 to avert 2°C rise

Building efficiency essential to tempering global climate change.

Codes and Standards | Jun 21, 2017

Senate bill would prohibit tax money for sports stadium projects

Bipartisan legislation would prevent use of municipal bonds by pro teams.

Codes and Standards | Jun 19, 2017

Developer, architect hit with $10 million construction defect verdict

Case pertained to construction of condo development that was not fire code-compliant.

Codes and Standards | Jun 15, 2017

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Campus plans include photovoltaic arrays and geothermal ground source heat pumps.

Codes and Standards | Jun 13, 2017

Canada Green Building Council and Green Business Certification Inc. announce partnership

New joint venture will deliver enhanced services and support tools and programs throughout Canada.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021