flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Florida gives developers more time to install first responder radio signal systems

Codes and Standards

Florida gives developers more time to install first responder radio signal systems

Expensive upgrades can be postponed for several years.


By Peter Fabris, Contributing Editor | April 27, 2016
Florida gives developers more time to install first responder radio signal systems

Photo: Phillip Pessar/Creative Commons.

New Florida building code legislation will allow building owners to postpone for several years a requirement for all new and existing buildings to provide minimum radio signal strength for fire department communications.

The code change that requires installation of necessary equipment and wiring in most commercial and multi-family buildings was to go into effect immediately, with no grace period. The provision, which necessitates opening up sections of walls and ceilings, has been estimated to cost over $1 million for some large structures.

A recently enacted update to the legislation provides for existing non-residential buildings to install the radio enhancement systems by Jan. 1, 2022, if owners submit their application for the installation permit by Dec. 31, 2019. Existing apartment buildings (including residential condominiums) are not required to install radio enhancement systems until Jan. 1, 2025, if they apply for the appropriate permits by Dec. 31, 2022.

The legislation now allows unit owner associations to stretch out special assessments over a number of years.

Related Stories

Codes and Standards | May 22, 2018

Registration open for 2018 National Energy Codes Conference

U.S. Department of Energy event to be held July 15th-17th in Austin.

Codes and Standards | May 21, 2018

New standard tests quietness of floors

ASTM International method will help manufacturers test their flooring materials.

Codes and Standards | May 17, 2018

California will require solar panels on most new homes

Projected to add $10,000 to cost of new homes.

Codes and Standards | May 16, 2018

New resources offer tips on off-site construction

NIBS documents address using pre-cast concrete, and commercial and legal considerations of modular construction.

Codes and Standards | May 15, 2018

Blast testing of loaded mass timber structures yields positive results

Four tests covered a spectrum of blast loads.

Codes and Standards | May 14, 2018

Maryland makes general contractors liable for failure of subs to pay employees

GCs could have to pay for up to three times the wages owed.

Codes and Standards | May 10, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

Codes and Standards | May 9, 2018

OSHA and state safety agencies write more than 100 silica citations in 6 months

Actions tending to come with investigation of other site conditions.

Codes and Standards | May 8, 2018

Powerhouse coalition builds energy positive buildings

The goal: build buildings that provide more power than they cost to build, run, and demolish.

Codes and Standards | May 7, 2018

Plan advances in Los Angeles for Climate Emergency Mobilization Department

Would oversee efforts to reduce greenhouse gas emissions across the city.

boombox1
boombox2
native1

More In Category



Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021