flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Five Stantec offices move into one Fifth Avenue location

Office Buildings

Five Stantec offices move into one Fifth Avenue location

The new location provides the firm with 40,000 sf of space.


By David Malone, Associate Editor | September 20, 2017
Employees in the new Stantec office in Midtown Manhattan

Photo courtesy of Stantec

Nearly 360 Stantec employees from across five New York offices have been consolidated into one new location at 475 Fifth Avenue in Midtown Manhattan. The new space provides the company with 40,000 sf across four floors in a 24-story LEED Silver certified building.

Stantec interior designers Sharon Steinberg and Charles Mitchem designed the new space. Common areas such as cafes, a materials resource library, and consolidated printing centers were created to help bring all of the new employees together. “Because so many of us are new to each other, it was important to draw employees to other floors, and across floors,” says Mitchem.

 

A kitchen and cafe space in the new Stantec officePhoto courtesy of Stantec.

 

475 Fifth Avenue is managed by JLL and features views of the New York Public Library and Bryant Park and is located just blocks from Grand Central Terminal.

 

The materials library at the new Stantec officePhoto courtesy of Stantec.

Related Stories

| Oct 18, 2011

Dow Building Solutions invests in two research facilities to deliver data to building and construction industry

  State-of-the-art monitoring system allows researchers to collect, analyze and process the performance of wall systems.

| Oct 17, 2011

Big D Floor covering supplies to offer Johnsonite Products??

Strategic partnership expands offering to south and west coast customers. 

| Oct 17, 2011

Schneider Electric introduces UL924 emergency lighting control devices

The emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time. 

| Oct 14, 2011

AISC develops new interoperability strategy to move construction industry forward

AISC is working to bring that vision to reality by developing a three-step interoperability strategy to evaluate data exchanges and integrate structural steel information into buildingSMART's Industry Foundation Classes.

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

| Oct 11, 2011

ThyssenKrupp elevator cabs validated by UL Environment

The conclusive and independent third-party validation process is another step toward a green product line.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021