flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Five fire scenarios tested on full-scale mass timber building

Codes and Standards

Five fire scenarios tested on full-scale mass timber building

Results will help inform code changes.


By Peter Fabris, Contributing Editor | July 27, 2017

Pixabay Public Domain

Five full-scale mass timber fire tests in a multi-story apartment building with promising results will be used to inform code changes.

The International Code Council Ad-hoc Committee on Tall Wood Buildings conducted the fire scenarios tested in two one-bedroom apartments constructed using mass timber. The test scenarios included various arrangements of exposed and unexposed cross-laminated timber (CLT) with open doors between living and sleeping areas.

In addition, the tests evaluated automatic sprinkler systems effectiveness. A General Technical Report FPL-GTR-247 on the fire tests will be available from the Forest Products Laboratory in the near future.

One finding after one test was that exposed CLT essentially self-extinguished due to the formation of char that protected the underlying wood. In two tests, sprinklers were able to effectively control the fire.

Related Stories

Codes and Standards | Apr 5, 2019

Manhattan expected to adopt congestion pricing plan for automobiles

New York would be first U.S. city to charge drivers extra for downtown motoring.

Codes and Standards | Apr 4, 2019

Chicago makes major building code overhaul

Previous comprehensive changes were done 70 years ago.

Codes and Standards | Apr 3, 2019

Construction advanced materials makers can enhance industry efficiency with technology

Integration of new IT approaches in construction with new materials has potential to enhance sustainability, alleviate worker shortage.

Codes and Standards | Apr 2, 2019

Open offices reduce collaboration among employees

Counterintuitive finding makes value of wide open workspaces questionable.

Codes and Standards | Mar 29, 2019

New timber traceability LEED credit released

Pilot credit aims to reduce use of illegal wood in buildings.

Codes and Standards | Mar 28, 2019

Swinerton forms new mass timber business group

Will pursue new projects being developed with mass timber.

Codes and Standards | Mar 27, 2019

Shortage of skilled construction workers resulting in missed deadlines

Some 40% of contractors have turned down project offers.

Codes and Standards | Mar 25, 2019

ICC release 2019 guidelines for safe use of repurposed shipping containers

Provides in-depth, technical overview on how to design, review, and approve shipping containers as building elements.

Codes and Standards | Mar 22, 2019

Tool helps cities develop framework for life-cycle energy policies and track progress

Identifies policies, funding sources to address building energy use.

Codes and Standards | Mar 21, 2019

New York City contractors adding 5% to 10% to construction costs due to trade war

Tariffs on steel, aluminum, and other materials swell budgets.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021