flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Five fire scenarios tested on full-scale mass timber building

Codes and Standards

Five fire scenarios tested on full-scale mass timber building

Results will help inform code changes.


By Peter Fabris, Contributing Editor | July 27, 2017

Pixabay Public Domain

Five full-scale mass timber fire tests in a multi-story apartment building with promising results will be used to inform code changes.

The International Code Council Ad-hoc Committee on Tall Wood Buildings conducted the fire scenarios tested in two one-bedroom apartments constructed using mass timber. The test scenarios included various arrangements of exposed and unexposed cross-laminated timber (CLT) with open doors between living and sleeping areas.

In addition, the tests evaluated automatic sprinkler systems effectiveness. A General Technical Report FPL-GTR-247 on the fire tests will be available from the Forest Products Laboratory in the near future.

One finding after one test was that exposed CLT essentially self-extinguished due to the formation of char that protected the underlying wood. In two tests, sprinklers were able to effectively control the fire.

Related Stories

Codes and Standards | Jan 29, 2020

Half of Manhattan’s new residential skyscrapers are empty

Excess comes as middle class housing shortage worsens.

Codes and Standards | Jan 28, 2020

Updated Engineered Wood Construction Guide now available

Provides guidance on building engineered wood floors, walls, and roofs.

Codes and Standards | Jan 24, 2020

Fenestration Rating Council earns ANSI certification

FenStar Certification Program ensures windows, doors, and skylights meet Energy Star specifications.

Codes and Standards | Jan 23, 2020

Rent control policies backfire on goal of boosting affordable housing

Natl. Apartment Assn. study says rent control decreases housing supply, harms condition of housing stock.

Codes and Standards | Jan 22, 2020

Potential energy savings from smart meters is largely unrealized

Most utilities underuse the technology that can help customers save money.

Codes and Standards | Jan 21, 2020

Contractors pay practices reviewed in new database

Fastest and slowest paying GCs revealed.

Codes and Standards | Jan 17, 2020

Several states with ambitious climate goals will have to restrict natural gas as a fuel

Buildings would have to heat and cook with electricity.

Codes and Standards | Jan 16, 2020

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.

Codes and Standards | Jan 14, 2020

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021