flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Five fire scenarios tested on full-scale mass timber building

Codes and Standards

Five fire scenarios tested on full-scale mass timber building

Results will help inform code changes.


By Peter Fabris, Contributing Editor | July 27, 2017

Pixabay Public Domain

Five full-scale mass timber fire tests in a multi-story apartment building with promising results will be used to inform code changes.

The International Code Council Ad-hoc Committee on Tall Wood Buildings conducted the fire scenarios tested in two one-bedroom apartments constructed using mass timber. The test scenarios included various arrangements of exposed and unexposed cross-laminated timber (CLT) with open doors between living and sleeping areas.

In addition, the tests evaluated automatic sprinkler systems effectiveness. A General Technical Report FPL-GTR-247 on the fire tests will be available from the Forest Products Laboratory in the near future.

One finding after one test was that exposed CLT essentially self-extinguished due to the formation of char that protected the underlying wood. In two tests, sprinklers were able to effectively control the fire.

Related Stories

| Jan 31, 2014

Center for Environmental Innovation in Roofing releases solar panel racking criteria for asphalt shingle roof systems

The Center for Environmental Innovation in Roofing’s PV Taskforce is releasing the first public draft of PV Racking and Attachment Criteria for Effective Asphalt Shingle Roof System Integration for an initial round of public comment.

| Jan 31, 2014

Developers are exceeding LEED standards for marketing purposes

Using LEED certification as a marketing tool is perceived by developers to be a successful tool, and this has pushed them to go above the minimum requirements at each level of certification, according to a study in the Environmental Science & Technology journal.

| Jan 31, 2014

OSHA extends feedback period for disclosure of workplace injuries proposal

The Occupational Safety and Health Administration said it would extend the comment period for a proposal that would require employers to submit electronic reports of workplace injuries and illnesses.

| Jan 31, 2014

DOE releases new efficiency standards for halide lamps

The Energy Department has finalized new energy efficiency standards for metal halide lamp fixtures, which are used in lighting for big box stores and parking lots.

| Jan 31, 2014

New LEED online platform now available for LEED v4 projects

LEED v4 projects will be the first to experience the new LEED Online platform with streamlined documentation and processes.

| Jan 26, 2014

New York extends, enhances tax abatements to promote green roofs

The expansion of a tax-abatement program for green roofs under New York state law doubles the previous maximum benefit of $100,000, adds new plant species to the list of those applicable for the tax break.

| Jan 23, 2014

Washington state micro apartment law prompts fire safety concerns

Proposed legislation to further regulate the building of micro apartments has triggered appeals from community activists concerned that fire safety standards are sub-par.

| Jan 23, 2014

Pennsylvania owes school districts $1B for construction projects

The Pennsylvania Department of Education owes about $1 billion to numerous school districts for about 350 state-approved renovation and construction projects. 

| Jan 23, 2014

About 1,500 concrete buildings in Los Angeles found vulnerable to earthquakes

Some 1,500 concrete structures built in Los Angeles before 1980 could be vulnerable to earthquakes, according to University of California researchers.

| Jan 23, 2014

Low-slope roofs with PVs tested for wind uplift resistance

Tests showed winds can cause photovoltaic panels to destroy waterproof membranes. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021