flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Five fire scenarios tested on full-scale mass timber building

Codes and Standards

Five fire scenarios tested on full-scale mass timber building

Results will help inform code changes.


By Peter Fabris, Contributing Editor | July 27, 2017

Pixabay Public Domain

Five full-scale mass timber fire tests in a multi-story apartment building with promising results will be used to inform code changes.

The International Code Council Ad-hoc Committee on Tall Wood Buildings conducted the fire scenarios tested in two one-bedroom apartments constructed using mass timber. The test scenarios included various arrangements of exposed and unexposed cross-laminated timber (CLT) with open doors between living and sleeping areas.

In addition, the tests evaluated automatic sprinkler systems effectiveness. A General Technical Report FPL-GTR-247 on the fire tests will be available from the Forest Products Laboratory in the near future.

One finding after one test was that exposed CLT essentially self-extinguished due to the formation of char that protected the underlying wood. In two tests, sprinklers were able to effectively control the fire.

Related Stories

Codes and Standards | Jul 10, 2017

New mass plywood panel project moves ahead with federal grant

New material is substitute for concrete and steel in multi-story projects.

Codes and Standards | Jul 6, 2017

Trump ups ante on apprenticeships, gives private sector more room to design them

Initiative aimed at alleviating construction industry worker shortage.

Codes and Standards | Jul 6, 2017

Flawed modeling to blame for green buildings failure to live up to hype on energy efficiency

Explains energy performance gap from expected savings to actual savings.

Codes and Standards | Jul 5, 2017

Research study examines tall timber buildings worldwide

Industry group developing criteria for categorizing wide range of construction approaches to tall timber buildings.

Codes and Standards | Jun 30, 2017

AAMA releases new document on aluminum fenestration and energy efficiency

The free download addresses entrances, storefront framing, curtain walls, windows and skylight fenestration systems.

Codes and Standards | Jun 29, 2017

Fire codes prevent cladding used on Grenfell Tower from being used in U.S.

Reports suggest an extra $6,300 for fire-resistant cladding could have prevented the tragedy.

Codes and Standards | Jun 28, 2017

Minimum Design Loads and Associated Criteria for Buildings and Other Structures, Standards ASCE/SEI 7-16, has been updated

The document is used for determining design loads including dead, live, soil, flood, tsunami, snow, rain, atmospheric ice, earthquake, wind, and fire.

Codes and Standards | Jun 27, 2017

Cold-formed steel framing engineering guide for building projects released

Better sound attenuation for subfloors and exterior continuous insulation are among the matters addressed.

Codes and Standards | Jun 26, 2017

L.A.’s new ordinance requires energy and water efficiency benchmarking

Structures 20,000 sf and larger must demonstrate steps to boost efficiency.

Codes and Standards | Jun 21, 2017

World Green Building Council: All buildings must be net zero by 2050 to avert 2°C rise

Building efficiency essential to tempering global climate change.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021