FitzGerald, headquartered in Chicago, has opened an office in Denver. The new location bolsters FitzGerald’s nationwide reach and capitalizes on local expertise to serve new and existing clients in Denver and the Front Range, as well as the Southwest United States, California, and Texas.
“Building a physical presence in Colorado is a big step for our firm and reiterates our commitment to offering our services to clients from coast to coast,” said Mike DeRouin, president of FitzGerald. “Remote/virtual collaboration has come a long way in recent years, but there is no substitute for local knowledge and boots on the ground in the Rockies and all things westward. We’re proud to make Denver our second home market and develop our own blueprint for national growth.”
ADAM BERKELHAMER TO HEAD NEW OFFICE
Leading the Denver office is Adam Berkelhamer, AIA an associate principal with FitzGerald since 2021.Berkelhamer heads several multifamily project teams across the country as well as acting as one of FitzGerald’s Design Directors.
Prior to FitzGerald Berkelhamer worked for over 25 years domestically and internationally on award-winning projects ranging from the largest roof structure in Europe (Liege-Guillemins TGV) to Class A residential developments in Chicago and Phoenix (30 West Oak, SoNo East, Domus).
He has explored multifamily design from large complexes of co-living apartments to high-end single-family residences.
Most recently, Berkelhamer was the leader of his own practice based in the San Francisco Bay area, where he designed multifamily properties and collaborated with FitzGerald and other firms.
MATTHEW WIEDENMAN REJOINS FITZGERALD IN DENVER OFFICE
The Denver office also recently expanded with the addition of senior associate Matthew Wiedenman. He rejoins FitzGerald as a member of the Denver team with local working knowledge of Colorado’s Front Range and the Vail Valley in urban multifamily development, mountain resort, and luxury residential work.
Wiedenman has a background in project management and extensive experience in multifamily housing, hospitality, senior living, recreational, adaptive reuse, and historic renovation projects—recently specializing in the use of panelized and room-scale modular construction methods to control project costs.
His work experience has resulted in built work across Colorado, Kansas, Nebraska, Iowa, and Illinois with additional pursuits in Arizona and Texas.
Related Stories
| Feb 7, 2012
Thornton Tomasetti opens new office in Denver
The firm, which now has 25 offices internationally, opened the new office to better serve current and potential clients in the western Central region and Mountain States.
| Feb 6, 2012
Slight increase in nonres construction spending expected in 2012, growth projected for 2013
Commercial sector expected to lead real estate recovery.
| Feb 6, 2012
FMI releases 2012 Construction Productivity Report
Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.
| Feb 6, 2012
Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum
EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.
| Feb 6, 2012
Batson-Cook announces the appointment of Hall as president
Hall will manage and direct all aspects of the firm’s day-to-day operations. He will be based in Batson-Cook’s Atlanta office.
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Feb 2, 2012
VLK Architects selected for new Cypress, Texas elementary school
The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.