FitzGerald, headquartered in Chicago, has opened an office in Denver. The new location bolsters FitzGerald’s nationwide reach and capitalizes on local expertise to serve new and existing clients in Denver and the Front Range, as well as the Southwest United States, California, and Texas.
“Building a physical presence in Colorado is a big step for our firm and reiterates our commitment to offering our services to clients from coast to coast,” said Mike DeRouin, president of FitzGerald. “Remote/virtual collaboration has come a long way in recent years, but there is no substitute for local knowledge and boots on the ground in the Rockies and all things westward. We’re proud to make Denver our second home market and develop our own blueprint for national growth.”
ADAM BERKELHAMER TO HEAD NEW OFFICE
Leading the Denver office is Adam Berkelhamer, AIA an associate principal with FitzGerald since 2021.Berkelhamer heads several multifamily project teams across the country as well as acting as one of FitzGerald’s Design Directors.
Prior to FitzGerald Berkelhamer worked for over 25 years domestically and internationally on award-winning projects ranging from the largest roof structure in Europe (Liege-Guillemins TGV) to Class A residential developments in Chicago and Phoenix (30 West Oak, SoNo East, Domus).
He has explored multifamily design from large complexes of co-living apartments to high-end single-family residences.
Most recently, Berkelhamer was the leader of his own practice based in the San Francisco Bay area, where he designed multifamily properties and collaborated with FitzGerald and other firms.
MATTHEW WIEDENMAN REJOINS FITZGERALD IN DENVER OFFICE
The Denver office also recently expanded with the addition of senior associate Matthew Wiedenman. He rejoins FitzGerald as a member of the Denver team with local working knowledge of Colorado’s Front Range and the Vail Valley in urban multifamily development, mountain resort, and luxury residential work.
Wiedenman has a background in project management and extensive experience in multifamily housing, hospitality, senior living, recreational, adaptive reuse, and historic renovation projects—recently specializing in the use of panelized and room-scale modular construction methods to control project costs.
His work experience has resulted in built work across Colorado, Kansas, Nebraska, Iowa, and Illinois with additional pursuits in Arizona and Texas.
Related Stories
| Jun 14, 2013
Purdue, industry partners test light steel framing for seismic safety
A partnership of leading earthquake engineering researchers from top U.S. and Canadian universities and design professionals from the steel industry have begun the final phase of a three-year project to increase the seismic safety of buildings that use lightweight cold-formed steel for their primary beams and columns.
| Jun 13, 2013
WorkingBuildings acquires Specialty Operations Solutions
The WorkingBuildings Companies, a leading provider of comprehensive Owner-based solutions for the built environment, announces the acquisition of Specialty Operations Solutions (SOS), a national provider of research and laboratory services.
| Jun 13, 2013
Health Product Declaration Collaborative names Knott as Executive Director
John L. Knott Jr. has been named as the Health Product Declaration Collaborative’s (www.hpdcollaborative.org) first Executive Director following a national search. The Health Product Declaration Collaborative (HPDC) is a customer-led standards-setting organization committed to the continuous improvement of the building industry’s environmental and health performance, through transparency and innovation in the building product supply chain.
| Jun 13, 2013
AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition
The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York.
| Jun 12, 2013
More than 90% of New York City schools have code violations
More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 12, 2013
Sacred synergy achieves goals for religious education [2013 Building Team Award winner]
A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.
| Jun 12, 2013
‘Talking’ Braille maps help the visual impaired
Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.
| Jun 11, 2013
Music/dance building supports sweet harmony [2013 Building Team Award winner]
A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.
| Jun 11, 2013
Vertical urban campus fills a tall order [2013 Building Team Award winner]
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.