FitzGerald, headquartered in Chicago, has opened an office in Denver. The new location bolsters FitzGerald’s nationwide reach and capitalizes on local expertise to serve new and existing clients in Denver and the Front Range, as well as the Southwest United States, California, and Texas.
“Building a physical presence in Colorado is a big step for our firm and reiterates our commitment to offering our services to clients from coast to coast,” said Mike DeRouin, president of FitzGerald. “Remote/virtual collaboration has come a long way in recent years, but there is no substitute for local knowledge and boots on the ground in the Rockies and all things westward. We’re proud to make Denver our second home market and develop our own blueprint for national growth.”
ADAM BERKELHAMER TO HEAD NEW OFFICE
Leading the Denver office is Adam Berkelhamer, AIA an associate principal with FitzGerald since 2021.Berkelhamer heads several multifamily project teams across the country as well as acting as one of FitzGerald’s Design Directors.
Prior to FitzGerald Berkelhamer worked for over 25 years domestically and internationally on award-winning projects ranging from the largest roof structure in Europe (Liege-Guillemins TGV) to Class A residential developments in Chicago and Phoenix (30 West Oak, SoNo East, Domus).
He has explored multifamily design from large complexes of co-living apartments to high-end single-family residences.
Most recently, Berkelhamer was the leader of his own practice based in the San Francisco Bay area, where he designed multifamily properties and collaborated with FitzGerald and other firms.
MATTHEW WIEDENMAN REJOINS FITZGERALD IN DENVER OFFICE
The Denver office also recently expanded with the addition of senior associate Matthew Wiedenman. He rejoins FitzGerald as a member of the Denver team with local working knowledge of Colorado’s Front Range and the Vail Valley in urban multifamily development, mountain resort, and luxury residential work.
Wiedenman has a background in project management and extensive experience in multifamily housing, hospitality, senior living, recreational, adaptive reuse, and historic renovation projects—recently specializing in the use of panelized and room-scale modular construction methods to control project costs.
His work experience has resulted in built work across Colorado, Kansas, Nebraska, Iowa, and Illinois with additional pursuits in Arizona and Texas.
Related Stories
K-12 Schools | Feb 26, 2015
D.C.'s Dunbar High School is world's highest-scoring LEED school, earns 91% of base credits
The 280,000-sf school achieved 91 points, out of 100 base points possible for LEED, making it the highest-scoring school in the world certified under USGBC’s LEED for Schools-New Construction system.
K-12 Schools | Feb 25, 2015
Polish architect designs modular ‘kids city’ kindergarten using shipping container frames
Forget the retrofit of a shipping container into a building for one moment. Designboom showcases the plans of Polish architect Adam Wiercinski to use just the recycled frames of containers to construct a “kids city.”
Building Team | Feb 24, 2015
Call for entries: 2015 Giants 300 survey
The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
Industrial Facilities | Feb 24, 2015
Starchitecture meets agriculture: OMA unveils design for Kentucky community farming facility
The $460 million Food Port project will define a new model for the relationship between consumer and producer.
Contractors | Feb 24, 2015
ABC economist: Year-end construction backlog drops 1%, but still outpaces 2013
Despite a quarter-over-quarter decline, the U.S. construction backlog ended the year at 8.7 months, 4.4% higher than one year ago.
University Buildings | Feb 23, 2015
Future-proofing educational institutions: 5 trends to consider
In response to rapidly changing conditions in K-12 and higher education, institutions and school districts should consider these five trends to ensure a productive, educated future.
Office Buildings | Feb 23, 2015
The importance of quiet and the consequences of distraction
Recent work style studies show that the average knowledge worker spends 25-35% of their time doing heads-down focused work. Once thrown off track, it can take some 23 minutes for a worker to return to the original task.
BIM and Information Technology | Feb 23, 2015
9 best practices for effective laser scanning
JE Dunn’s National BIM Director, Trent Nichols, offers tips and advice for mastering the art of laser scanning.
Modular Building | Feb 23, 2015
Edge construction: The future of modular
Can innovative project delivery methods, namely modular construction, bring down costs and offer a solution for housing in urban markets? FXFOWLE’s David Wallance discusses the possibilities for modular.
Contractors | Feb 23, 2015
Rising Nonresidential Construction Index comes with struggles, FMI reports
Construction companies face the challenge of having enough people to keep up with increasing backlogs.