flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First RFP requiring modular construction on New York City housing project issued

Codes and Standards

First RFP requiring modular construction on New York City housing project issued

Part of Housing 2.0 modular construction initiative.


By Peter Fabris, Contributing Editor | June 11, 2018
Prefabricated construction site
Prefabricated construction site

The New York City Department of Preservation and Housing recently issued its first request for proposals under its Housing 2.0 modular construction initiative.

The RFP is for a new mixed-use affordable housing project on city-owned 49,397 sf site in Brooklyn. Using modular construction will allow the department to reduce construction costs, get housing built faster, and respond more quickly to demographic shifts, officials contend.

The use of modular construction for affordable housing initiatives has gained support in recent years, despite a lack of modular manufacturers in the New York metro area and logistical challenges that come with delivering and storing large modular pieces.

Deputy Mayor Alicia Glen said the goal of the program was to master mid-rise, modular multifamily development to help meet the city’s increased affordable housing goals, according to a report in The Real Deal. The city aims to create or preserve 300,000 residential units by 2026.

Related Stories

| May 10, 2012

Industry groups urge Congress to leave contracting decisions to agencies

An organization of several industry groups urged Congress to leave many contracting decisions to the discretion of individual agencies by avoiding blanket mandates.

| May 10, 2012

OSHA proposes new rule to have employers find and fix hazards

The Occupational Safety and Health Administration has proposed a new regulation, Injury and Illness Prevention Program, or I2P2, which would compel employers to find and fix safety hazards.

| May 3, 2012

Stay current on green codes at AGC Environmental Conference

Keep abreast of market trends such as 2012 changes to green standards and codes at the AGC Contractors Environmental Conference, June 7-8, 2012 in Arlington, Va.

| May 3, 2012

OSHA reduces fines in Cincinnati casino collapse

The Occupational Safety and Health Administration has reduced the number of violations from four to two against four firms it cited earlier this month in the collapse of a casino under construction in Cincinnati.

| May 3, 2012

New York City implements controversial crane licensing requirements

New York City officials announced strict new licensing and testing requirements for all crane operators in New York City to raise safety standards.

| May 3, 2012

Green-roof requirement now includes industrial facilities in Toronto

A mandate that requires installation of green roofs on new commercial and residential buildings in Toronto has been expanded to include industrial facilities.

| May 3, 2012

Innovative wastewater treatment helps achieve LEED rating

LEED for New Construction, Neighborhood Development and the LEED Volume Program offer some ways to achieve LEED points when dealing with wastewater treatment.

| Apr 26, 2012

Lack of bolts on steel support caused collapse at Cincinnati casino

Too few bolts connecting horizontal steel support beams with vertical steel columns was the cause of January’s construction accident at Horseshoe Casino Cincinnati, according to the report of the Occupational Safety and Health Administration.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021