flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First phase of Presidium Waterford breaks ground in Austin, Texas

Multifamily Housing

First phase of Presidium Waterford breaks ground in Austin, Texas

O’Brien Architects and Dwell Design Studio are designing the project.


By David Malone, Associate Editor | March 15, 2021
Presidium Waterford exterior

Renderings courtesy Presidium

A new five- and six-story luxury apartment complex, dubbed Presidium Waterford, has broken ground on its first phase in Austin, Texas.

The 281,533-sf residential community will include 283-units in an open building design with plenty of natural light. Each apartment unit will include smart thermostats, smart lighting, and smart touchless unit and amenity entries that can be accessed through a single smartphone app. 

The community will also include environmentally-focused features such as increased insulate properties in the windows and exterior insulation, a 100% rainwater bio filtration system, energy-efficient appliances, and energy-efficient building systems. Innovative sanitation methods will be implemented through state-of-the-art air purification systems and touchless entry doors, faucets, and facility hardware.

 

Presidium waterford

 

Interior common spaces will provide guests and residents multiple cowering office lounges and a gym with spin and yoga studios that connect to the outdoor lawn. A large open-air courtyard with outdoor spaces, a resort-style pool, a water volleyball court, outdoor fireplaces, a fully amenities paseo, a Zen courtyard with fire fits, a shaded hammock grove, and a Bocce court are also included.

The development is located minutes from The Domain, Austin’s “second downtown,” at 183 and Waterford Centre Blvd. The first units are expected to be delivered by Dec. 2022.

Related Stories

Codes and Standards | Oct 17, 2022

Ambitious state EV adoption goals put pressure on multifamily owners to provide chargers

California’s recently announced ban on the sale of new gas-powered vehicles starting in 2035—and New York’s recent decision to follow suit—are putting pressure on multifamily property owners to install charging stations for tenants.

Multifamily Housing | Oct 7, 2022

Design for new Ft. Lauderdale mixed-use tower features sequence of stepped rounded volumes

The newly revealed design for 633 SE 3rd Ave., a 47-story, mixed-use tower in Ft. Lauderdale, features a sequence of stepped rounded volumes that ease the massing of the tower as it rises.

Multifamily Housing | Oct 5, 2022

Co-living spaces, wellness-minded designs among innovations in multifamily housing

The booming multifamily sector shows no signs of a significant slowdown heading into 2023. Here is a round up of Giants 400 firms that are driving innovation in this sector.

Fire and Life Safety | Oct 4, 2022

Fire safety considerations for cantilevered buildings

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

| Oct 4, 2022

Rental property owners want access to utility usage data for whole properties

As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.

Resiliency | Sep 30, 2022

Designing buildings for wildfire defensibility

Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.

Multifamily Housing | Sep 15, 2022

Toronto’s B-Line Condominiums completed using prefabricated panels

B-Line Condos, Toronto, completed using Sto Panel Technology.

Multifamily Housing | Sep 15, 2022

Heat Pumps in Multifamily Projects

RMI's Lacey Tan gives the basics of heat pumps and how they can reduce energy costs and carbon emissions in apartment projects.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021