flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First phase of Presidium Waterford breaks ground in Austin, Texas

Multifamily Housing

First phase of Presidium Waterford breaks ground in Austin, Texas

O’Brien Architects and Dwell Design Studio are designing the project.


By David Malone, Associate Editor | March 15, 2021
Presidium Waterford exterior

Renderings courtesy Presidium

A new five- and six-story luxury apartment complex, dubbed Presidium Waterford, has broken ground on its first phase in Austin, Texas.

The 281,533-sf residential community will include 283-units in an open building design with plenty of natural light. Each apartment unit will include smart thermostats, smart lighting, and smart touchless unit and amenity entries that can be accessed through a single smartphone app. 

The community will also include environmentally-focused features such as increased insulate properties in the windows and exterior insulation, a 100% rainwater bio filtration system, energy-efficient appliances, and energy-efficient building systems. Innovative sanitation methods will be implemented through state-of-the-art air purification systems and touchless entry doors, faucets, and facility hardware.

 

Presidium waterford

 

Interior common spaces will provide guests and residents multiple cowering office lounges and a gym with spin and yoga studios that connect to the outdoor lawn. A large open-air courtyard with outdoor spaces, a resort-style pool, a water volleyball court, outdoor fireplaces, a fully amenities paseo, a Zen courtyard with fire fits, a shaded hammock grove, and a Bocce court are also included.

The development is located minutes from The Domain, Austin’s “second downtown,” at 183 and Waterford Centre Blvd. The first units are expected to be delivered by Dec. 2022.

Related Stories

| Aug 1, 2012

C.W. Driver forms Driver URBAN

Driver URBAN specializes in the construction of multi-family apartments, mixed-use developments, affordable housing, student and senior housing, and hospitality projects.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 19, 2012

Rental market pushing service, ‘community’

The Top 25 Giants 300 AEC firms in the Multifamily Sector keep four-legged tenants in mind.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 9, 2012

Oakdale, Calif., Heritage Oaks Senior Apartments opens

New complex highlights senior preferences for amenities.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

2011 Reconstruction Awards Profile: Ka Makani Community Center

An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021