flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens

Multifamily Housing

First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens

Amenity-rich City Club Apartments offer housing at multiple price points.


By Peter Fabris, Contributing Editor | February 24, 2022
City Club Apartments CBD
CBD Detroit overlooks Grand Circus Park, and is one of the two developments by City Club Apartments.

City Club Apartments completed two multifamily projects in 2021 in downtown Detroit including the first new, mixed-use high-rise in Detroit’s central business district in nearly 30 years.
 
Designed by BKV Group, the 288-unit City Club Apartments CBD Detroit is an amenity-rich, seven-story development overlooking Grand Circus Park. It revitalizes a vacant urban infill site that was once home to the historic Statler Hotel.
 
Offering housing at a variety of price points, CCA CBD Detroit features studio, one-, two- and three-bedroom units including penthouses and townhomes. There are 53 different floor plans, with four finish packages available.

BKV Model Unit
A model unit in CBD Detroit.
CBD Detroit landscape
CBD Detroit respects the surrounding cityscape.

For visual appeal and scale that respects the surrounding cityscape, the single building has the appearance of multiple structures. The street-facing facade features a neutral color palette of white, black, and wood tones. The interior courtyard showcases a bold mix of colors and patterns associated with the City Club Apartments brand. The concave front of the building facing Grand Circus Park mimics the curve of the streets marking the park’s perimeter.

Amenity Design
Amenity design was extremely important to the BKV Group.

Amenities support social connections. They include a lobby lounge library; entertainment club room with kitchen; theater; 24/7 Whole Body Fitness Center, a business center with conference room, and an indoor pool and hot tub that connects to an expansive courtyard via garage doors. Outside, a kitchen and bar area, separate outdoor theater/event space, Zen garden, and bark park are available for residents. A multi-story exterior mural on the adjacent CCA Detroit property overlooks the courtyard.
 
CCA CBD Detroit’s retail spaces, situated adjacent to the park, take advantage of the views for outdoor dining and connection to the community. Tenants include The Statler Bistro, the city’s first indoor/outdoor casual French dining destination and Premier Pet Supply.
 
BKV Group also served as the interior designer for the renovation of CCA Lafayette Park, a significant update of a 1970s-era multifamily community formerly known as Elmwood Park Plaza. Interior work included upgrades of existing units, including four standard and four penthouse plans. Improvements include new flooring, paint, and lighting, as well as updated kitchens and baths. Select units offer movable kitchen islands, glass tile backsplashes, granite kitchen countertops, and private balconies.

BKV Lafayette Park Lobby
BKV's interior design for the lobby at Lafayette Park.

 

Club Room Lafayette Park
The Club Room at Lafayette Park was designed to show hospitality to residents and visitors.


City Club’s standard hospitality-inspired amenities include a lobby lounge library and entertainment club room on the first floor that connects to the adjacent outdoor Terrace Club. The latter space houses a pool, hot tub, cabanas, and poolside grilling stations, as well as a Zen garden, beach volleyball court, bark park, and dog run. Other indoor offerings include a penthouse-level sky lounge with city and river views. The renovation also included facade enhancements featuring tree-inspired greenery that serves as an extension of the landscaped Terrace Club below.
 
City Club Apartments CBD Detroit
Owner and/or developer: City Club Apartments
Design architect: BKV Group
Interior designer: BKV Group
Architect of record: BKV Group
MEP engineer: BKV Group
Structural engineer: BKV Group
General contractor/construction manager: Wolverine Building Group
 
City Club Apartments Lafayette Park
Owner and/or developer: City Club Apartments
Design architect: McIntosh Poris Associates
Interior designer: BKV Group
Architect of record: McIntosh Poris Associates
MEP engineer: ETS Engineering, Inc., and Sellinger Associates Inc.
Structural engineer: Odeh Engineers
General contractor/construction manager: MIG Construction

Related Stories

Multifamily Housing | Aug 24, 2020

Portland’s zoning reform looks to boost the ‘missing middle’ of housing

The city council in Portland, Ore., recently approved the “Residential Infill Project” (RIP), a package of amendments to the city’s zoning code that legalizes up to four homes on nearly any residential lot and sharply limits building sizes.

Multifamily Housing | Aug 24, 2020

Texaco’s century-old headquarters is now a luxury apartment community

After sitting vacant for nearly three decades, the former home of Texaco, Inc. has been converted into a 17-story, 286-unit apartment building in the heart of downtown Houston.

Multifamily Housing | Aug 23, 2020

Designing affordable housing on odd urban lots in LA

"Misfit parcels" could be the key to providing more affordable housing in Los Angeles, say two experienced multifamily housing designers.

Multifamily Housing | Aug 16, 2020

TCA Architects specifies Engineered Floors products for 304-unit apartment complex in Tracy, Calif.

TCA Architects specified Lewis Rigid Stone Polymer floating plank and Lewis Gold 100% Solution-Dyed high-performance fiber carpet for Harvest in Tracy, Calif.

Multifamily Housing | Aug 3, 2020

71-unit 100% affordable housing development breaks ground in Mountain View, Calif.

Van Meter Williams Pollack is designing the project.

Multifamily Housing | Aug 2, 2020

Stantec-designed 17 West mixed-use development completed in Miami Beach

Stantec-designed 17 West mixed-use development completed, with first Trader Joe's in Miami Beach.

Multifamily Housing | Jul 31, 2020

Railings manufacturer VistaPro launches its new website

VistaPro Architectural Railing Solutions launches new website.

Multifamily Housing | Jul 29, 2020

Multifamily construction proposal activity sees modest rebound in Q2 2020

Among the firms that work in the multifamily sector, 31% said that proposal activity increased in the second quarter, while 24% said it decreased.

Multifamily Housing | Jul 29, 2020

San Francisco’s Millennium Tower fix approved, moving forward

Simpson Gumpertz & Heger will be the engineer-of-record for the fix.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021