Editor's note: We re-posted this article after a technical glitch prevented readers from viewing the original version. We apologize for the error.
Zaha Hadid Architects and Melco Crown Entertainment have unveiled the design for a 780-room hotel to be built on Melco's flagship property, City of Dreams. Located in Catai, Macau, City of Dreams is a recreational hub that includes hotels, restaurants and live entertainment.
Hadid's design, which will become the fifth hotel tower on the property, features a latticed exoskeleton enveloping the building's exterior. The 40-floor, 150,000-square-foot space is envisioned as a monolith with voids carved throughout.
"The tower’s exposed exoskeleton reinforces the dynamism of the design," the architects said in a press release. "Expressive and powerful, this external structure optimizes the interior layouts and envelops the building, further de?ning its formal composition and establishing relationships with the new Cotai strip. "
Traditional elements of architecture are merged in the roof, walls and ceiling in order to create a unified sculptural theme that defines the building's public spaces. These will include will include event facilities, gaming rooms, restaurants, a spa, and a sky pool.
Construction began last year and is set to be completed in 2017, according to Dezeen.
Take a look at the newly-released renderings:
Related Stories
| May 14, 2012
SOM to break ground on supertall structure in China
The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| May 14, 2012
SMPS and Deltek announce alliance
A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.
| May 14, 2012
ArchiCAD e-Specs integration unveiled
Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.
| May 11, 2012
2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution
Download the complete White Paper, Chapters 1-10
| May 11, 2012
Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings
We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.
| May 11, 2012
Chapter 9 The Key to Commissioning That Works? It Never Stops
Why commissioning for existing and renovated buildings needs to be continuous to be effective.
| May 11, 2012
Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity
What historic preservationists and energy-performance advocates can learn from each other.
| May 11, 2012
VFA to acquire Altus Group's Capital Planning division
Strategic move strengthens VFA's facilities capital planning market osition in North America.
| May 11, 2012
Betz promoted to senior vice president for McCarthy’s San Diego Office
He will oversee client relations, estimating, office operations and personnel as well as integration of the company’s scheduling, safety and contracts departments.