Zaha Hadid Architects and Melco Crown Entertainment have unveiled the design for a 780-room hotel to be built on Melco's flagship property, City of Dreams. Located in Catai, Macau, City of Dreams is a recreational hub that includes hotels, restaurants, and live entertainment.
Hadid's design, which will become the fifth hotel tower on the property, features a latticed exoskeleton enveloping the building's exterior. The 40-floor tower is envisioned as a monolith with voids carved throughout.
"The tower’s exposed exoskeleton reinforces the dynamism of the design," the architects said in a press release. "Expressive and powerful, this external structure optimizes the interior layouts and envelops the building, further de?ning its formal composition and establishing relationships with the new Cotai strip."
Traditional elements of architecture are merged in the roof, walls, and ceiling in order to create a unified sculptural theme that defines the building's public spaces. These include event facilities, gaming rooms, restaurants, a spa, and a sky pool.
The hotel is set to be completed in 2017, according to Dezeen.
Take a look at the newly-released renderings:
Related Stories
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.