flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: University of Utah's ‘teaching hospital for law’

First look: University of Utah's ‘teaching hospital for law’

University breaks ground on law school building designed to facilitate new approaches to legal education.


By BD+C Editors | June 7, 2013
The University of Utah broke ground today on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.
 
“With this new building, the College of Law will advance its mission to establish a ‘teaching hospital for law’-- an innovative vision for the future of legal education,” said University of Utah President David W. Pershing. “Expanded and improved facilities will enable a variety of educational tracks aimed at improving the human condition, including global justice and the evolving field of biolaw.”
 
Designed by VCBO Architecture (architect of record) and SmithGroupJJR (design architect), the facility will feature a library integrated throughout the building, state-of-the-art training facilities, spaces for collaborative research, advanced but flexible learning technology, practice courtrooms and a top-floor conference center. By providing a wide array of flexible spaces for small group training, the building efficiently provides more space-per-student, bringing it in line with peer institutions.
 
 
 
All images © VCBO/SMITHGROUP JJR Architecture and the College of Law
 
 
 
“This building will fulfill the educational needs of tomorrow’s lawyers while serving the broader Utah legal community and the community at large,” said Bob Adler, interim dean of the S. J. Quinney College of Law. “We are committed to using the facility in ways that will better prepare skilled attorneys and problem-solving leaders.”
 
The College of Law faculty plans to use the new building to expand its already substantial commitment to community service and community-engaged learning. University of Utah law students provided almost 50,000 hours of volunteer pro bono and clinical service during the 2012-13 academic year. The new building will enable the school to continue this tradition by providing facilities for direct client interaction.
 
The new building is designed to achieve LEED platinum certification, the highest designation using Leadership in Energy and Environmental Design standards and will provide accessibility for a full range of disabilities. Located at the southwest corner of campus across from the Stadium TRAX station, the building will establish a welcoming gateway for visitors to the campus.
 
To date, the building has received generous support from the S.J. and Jessie E. Quinney Foundation, the University of Utah, the Church of Jesus Christ of Latter-day Saints, and the Alternative Visions Fund of the Chicago Community Trust as well as a growing number of law firms and individual donors.
 
 
 
The $4.5 million donation from the Alternative Visions Fund is dedicated specifically to taking the facility’s sustainable features to the next level. Among the attributes made possible through this donation are an innovative cooling system using groundwater from near the building site, recycling and reuse of building grey water to flush toilets and for other non-potable uses, on-site and off-site solar power generation, electric car charging stations and more.
 
Big-D Construction will begin work on the new, 155,000-square-foot building on June 17, and the building is expected to be ready for the 2015-16 academic year.
 
All plans courtesy VCBO Architecture

Related Stories

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

| May 3, 2012

U of Michigan team looking to create highly efficient building envelope designs

The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

| May 3, 2012

Zero Energy Research Lab opens at North Texas

The living lab—the only one of its kind in Texas—is designed to test various technologies and systems in order to achieve a net-zero consumption of energy.

| May 3, 2012

NSF publishes ANSI standard evaluating the sustainability of single ply roofing membranes

New NSF Standard provides manufacturers, specifiers and building industry with verifiable, objective criteria to identify sustainable roofing products.

| May 3, 2012

Gilbane to provide CM services for North Reading’s integrated middle/high school

The project scope includes a wastewater treatment plant, demolition of the existing high school and extensive athletic fieldwork.

| May 3, 2012

Howard S. Turner 1911–2012

A founding member of the Turner Construction Co.

| May 3, 2012

Ground broken for $94 million hospital expansion at Scripps Encinitas

New facility to more than double emergency department size, boost inpatient beds by 43%.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021