flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: University of Utah's ‘teaching hospital for law’

First look: University of Utah's ‘teaching hospital for law’

University breaks ground on law school building designed to facilitate new approaches to legal education.


By BD+C Editors | June 7, 2013
The University of Utah broke ground today on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.
 
“With this new building, the College of Law will advance its mission to establish a ‘teaching hospital for law’-- an innovative vision for the future of legal education,” said University of Utah President David W. Pershing. “Expanded and improved facilities will enable a variety of educational tracks aimed at improving the human condition, including global justice and the evolving field of biolaw.”
 
Designed by VCBO Architecture (architect of record) and SmithGroupJJR (design architect), the facility will feature a library integrated throughout the building, state-of-the-art training facilities, spaces for collaborative research, advanced but flexible learning technology, practice courtrooms and a top-floor conference center. By providing a wide array of flexible spaces for small group training, the building efficiently provides more space-per-student, bringing it in line with peer institutions.
 
 
 
All images © VCBO/SMITHGROUP JJR Architecture and the College of Law
 
 
 
“This building will fulfill the educational needs of tomorrow’s lawyers while serving the broader Utah legal community and the community at large,” said Bob Adler, interim dean of the S. J. Quinney College of Law. “We are committed to using the facility in ways that will better prepare skilled attorneys and problem-solving leaders.”
 
The College of Law faculty plans to use the new building to expand its already substantial commitment to community service and community-engaged learning. University of Utah law students provided almost 50,000 hours of volunteer pro bono and clinical service during the 2012-13 academic year. The new building will enable the school to continue this tradition by providing facilities for direct client interaction.
 
The new building is designed to achieve LEED platinum certification, the highest designation using Leadership in Energy and Environmental Design standards and will provide accessibility for a full range of disabilities. Located at the southwest corner of campus across from the Stadium TRAX station, the building will establish a welcoming gateway for visitors to the campus.
 
To date, the building has received generous support from the S.J. and Jessie E. Quinney Foundation, the University of Utah, the Church of Jesus Christ of Latter-day Saints, and the Alternative Visions Fund of the Chicago Community Trust as well as a growing number of law firms and individual donors.
 
 
 
The $4.5 million donation from the Alternative Visions Fund is dedicated specifically to taking the facility’s sustainable features to the next level. Among the attributes made possible through this donation are an innovative cooling system using groundwater from near the building site, recycling and reuse of building grey water to flush toilets and for other non-potable uses, on-site and off-site solar power generation, electric car charging stations and more.
 
Big-D Construction will begin work on the new, 155,000-square-foot building on June 17, and the building is expected to be ready for the 2015-16 academic year.
 
All plans courtesy VCBO Architecture

Related Stories

| May 31, 2012

2011 Reconstruction Awards Profile: Ka Makani Community Center

An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.

| May 31, 2012

5 military construction trends

Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.

| May 31, 2012

New School’s University Center in NYC topped out

16-story will provide new focal point for campus.

| May 31, 2012

Day & Zimmermann taps Jobe for ECM VP

Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.

| May 31, 2012

Perkins+Will-designed engineering building at University of Buffalo opens

Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.

| May 30, 2012

Construction milestone reached for $1B expansion of San Diego International Airport

Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.

| May 30, 2012

Pringle Brandon in discussions to join forces with Perkins+Will

The London offices would be known as Pringle Brandon Perkins+Will.

| May 30, 2012

Boral Bricks announces winners of “Live.Work.Learn” student architecture contest

Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.

| May 30, 2012

Hill International to manage construction of Al Risafa Stadium in Iraq

The three-year contract has an estimated value to Hill of approximately $3.3 million.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021