flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: University of Utah's ‘teaching hospital for law’

First look: University of Utah's ‘teaching hospital for law’

University breaks ground on law school building designed to facilitate new approaches to legal education.


By BD+C Editors | June 7, 2013
The University of Utah broke ground today on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.
 
“With this new building, the College of Law will advance its mission to establish a ‘teaching hospital for law’-- an innovative vision for the future of legal education,” said University of Utah President David W. Pershing. “Expanded and improved facilities will enable a variety of educational tracks aimed at improving the human condition, including global justice and the evolving field of biolaw.”
 
Designed by VCBO Architecture (architect of record) and SmithGroupJJR (design architect), the facility will feature a library integrated throughout the building, state-of-the-art training facilities, spaces for collaborative research, advanced but flexible learning technology, practice courtrooms and a top-floor conference center. By providing a wide array of flexible spaces for small group training, the building efficiently provides more space-per-student, bringing it in line with peer institutions.
 
 
 
All images © VCBO/SMITHGROUP JJR Architecture and the College of Law
 
 
 
“This building will fulfill the educational needs of tomorrow’s lawyers while serving the broader Utah legal community and the community at large,” said Bob Adler, interim dean of the S. J. Quinney College of Law. “We are committed to using the facility in ways that will better prepare skilled attorneys and problem-solving leaders.”
 
The College of Law faculty plans to use the new building to expand its already substantial commitment to community service and community-engaged learning. University of Utah law students provided almost 50,000 hours of volunteer pro bono and clinical service during the 2012-13 academic year. The new building will enable the school to continue this tradition by providing facilities for direct client interaction.
 
The new building is designed to achieve LEED platinum certification, the highest designation using Leadership in Energy and Environmental Design standards and will provide accessibility for a full range of disabilities. Located at the southwest corner of campus across from the Stadium TRAX station, the building will establish a welcoming gateway for visitors to the campus.
 
To date, the building has received generous support from the S.J. and Jessie E. Quinney Foundation, the University of Utah, the Church of Jesus Christ of Latter-day Saints, and the Alternative Visions Fund of the Chicago Community Trust as well as a growing number of law firms and individual donors.
 
 
 
The $4.5 million donation from the Alternative Visions Fund is dedicated specifically to taking the facility’s sustainable features to the next level. Among the attributes made possible through this donation are an innovative cooling system using groundwater from near the building site, recycling and reuse of building grey water to flush toilets and for other non-potable uses, on-site and off-site solar power generation, electric car charging stations and more.
 
Big-D Construction will begin work on the new, 155,000-square-foot building on June 17, and the building is expected to be ready for the 2015-16 academic year.
 
All plans courtesy VCBO Architecture

Related Stories

| Apr 10, 2013

6 funding sources for charter school construction

Competition for grants, loans, and bond financing among charter schools is heating up, so make your clients aware of these potential sources.

| Apr 10, 2013

23 things you need to know about charter schools

Charter schools are growing like Topsy. But don’t jump on board unless you know what you’re getting into.

| Apr 9, 2013

FMI predicts 8% rise in construction put in place for 2013

FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels. 

| Apr 8, 2013

Most daylight harvesting schemes fall short of performance goals, says study

Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.

| Apr 6, 2013

Lord, Aeck & Sargent and Urban Collage merge

In a move that brings full-service planning expertise to its already well-established architecture practice, Lord, Aeck & Sargent (LAS) has merged with Urban Collage (UC), one of the largest urban and campus planning and design firms in the Southeast. Combining these firms’ talents was made official today. UC plans to retain its name for the foreseeable future.

| Apr 6, 2013

First look: GlaxoSmithKline's double LEED Platinum office

GlaxoSmithKline and Liberty Property Trust/Synterra Partners transform the work environment with the opening of Five Crescent Drive

| Apr 5, 2013

Bangkok gets a leaning tower, that may topple

A seven-story apartment tower under construction in Bangkok has started to tilt and is on the verge of toppling.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021