flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: University of Utah's ‘teaching hospital for law’

First look: University of Utah's ‘teaching hospital for law’

University breaks ground on law school building designed to facilitate new approaches to legal education.


By BD+C Editors | June 7, 2013
The University of Utah broke ground today on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.
 
“With this new building, the College of Law will advance its mission to establish a ‘teaching hospital for law’-- an innovative vision for the future of legal education,” said University of Utah President David W. Pershing. “Expanded and improved facilities will enable a variety of educational tracks aimed at improving the human condition, including global justice and the evolving field of biolaw.”
 
Designed by VCBO Architecture (architect of record) and SmithGroupJJR (design architect), the facility will feature a library integrated throughout the building, state-of-the-art training facilities, spaces for collaborative research, advanced but flexible learning technology, practice courtrooms and a top-floor conference center. By providing a wide array of flexible spaces for small group training, the building efficiently provides more space-per-student, bringing it in line with peer institutions.
 
 
 
All images © VCBO/SMITHGROUP JJR Architecture and the College of Law
 
 
 
“This building will fulfill the educational needs of tomorrow’s lawyers while serving the broader Utah legal community and the community at large,” said Bob Adler, interim dean of the S. J. Quinney College of Law. “We are committed to using the facility in ways that will better prepare skilled attorneys and problem-solving leaders.”
 
The College of Law faculty plans to use the new building to expand its already substantial commitment to community service and community-engaged learning. University of Utah law students provided almost 50,000 hours of volunteer pro bono and clinical service during the 2012-13 academic year. The new building will enable the school to continue this tradition by providing facilities for direct client interaction.
 
The new building is designed to achieve LEED platinum certification, the highest designation using Leadership in Energy and Environmental Design standards and will provide accessibility for a full range of disabilities. Located at the southwest corner of campus across from the Stadium TRAX station, the building will establish a welcoming gateway for visitors to the campus.
 
To date, the building has received generous support from the S.J. and Jessie E. Quinney Foundation, the University of Utah, the Church of Jesus Christ of Latter-day Saints, and the Alternative Visions Fund of the Chicago Community Trust as well as a growing number of law firms and individual donors.
 
 
 
The $4.5 million donation from the Alternative Visions Fund is dedicated specifically to taking the facility’s sustainable features to the next level. Among the attributes made possible through this donation are an innovative cooling system using groundwater from near the building site, recycling and reuse of building grey water to flush toilets and for other non-potable uses, on-site and off-site solar power generation, electric car charging stations and more.
 
Big-D Construction will begin work on the new, 155,000-square-foot building on June 17, and the building is expected to be ready for the 2015-16 academic year.
 
All plans courtesy VCBO Architecture

Related Stories

| Nov 8, 2013

Net-zero bellwether demonstrates extreme green, multifamily style

The 10-unit zHome in Issaquah Highlands, Wash., is the nation’s first net-zero multifamily project, as certified this year by the International Living Future Institute.

| Nov 8, 2013

Walkable solar pavement debuts at George Washington University

George Washington University worked with supplier Onyx Solar to design and install 100 sf of walkable solar pavement at its Virginia Science and Technology Campus in Ashburn, Va.

| Nov 6, 2013

PECI tests New Buildings Institute’s plug load energy use metrics at HQ

Earlier this year, PECI used the NBI metrics to assess plug load energy use at PECI headquarters in downtown Portland, Ore. The study, which informed an energy-saving campaign, resulted in an 18 percent kWh reduction of PECI’s plug load.

| Nov 5, 2013

Net-zero movement gaining traction in U.S. schools market

As more net-zero energy schools come online, school officials are asking: Is NZE a more logical approach for school districts than holistic green buildings? 

| Nov 5, 2013

New IECC provision tightens historic building exemption

The International Energy Conservation Code has been revised to eliminate what has been seen as a blanket exemption for historic buildings.

| Nov 5, 2013

Living Building Challenge clarifies net-zero definitions and standards

The Living Building Challenge has released the Net Zero Energy Building Certification to provide clearer definitions regarding what net zero really means and how it is to be achieved.

| Nov 5, 2013

Oakland University’s Human Health Building first LEED Platinum university building in Michigan [slideshow]

Built on the former site of a parking lot and an untended natural wetland, the 160,260-sf, five-story, terra cotta-clad building features some of the industry’s most innovative, energy-efficient building systems and advanced sustainable design features.

| Nov 4, 2013

Architecture and engineering industry outlook remains positive on all major indicators

While still below pre-recession levels, all of the key indicators in the latest Quarterly Market Forecast (QMF) report from PSMJ Resources remain in positive territory.  

| Nov 1, 2013

CBRE Group enhances healthcare platform with acquisition of KLMK Group

CBRE Group, Inc. (NYSE:CBG) today announced that it has acquired KLMK Group, a leading provider of facility consulting, project advisory and facility activation solutions to the healthcare industry. 

| Oct 31, 2013

74 years later, Frank Lloyd Wright structure built at Florida Southern College

The Lakeland, Fla., college adds to its collection of FLW buildings with the completion of the Usonian house, designed by the famed architect in 1939, but never built—until now. 

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021