flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: University of Utah's ‘teaching hospital for law’

First look: University of Utah's ‘teaching hospital for law’

University breaks ground on law school building designed to facilitate new approaches to legal education.


By BD+C Editors | June 7, 2013
The University of Utah broke ground today on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.
 
“With this new building, the College of Law will advance its mission to establish a ‘teaching hospital for law’-- an innovative vision for the future of legal education,” said University of Utah President David W. Pershing. “Expanded and improved facilities will enable a variety of educational tracks aimed at improving the human condition, including global justice and the evolving field of biolaw.”
 
Designed by VCBO Architecture (architect of record) and SmithGroupJJR (design architect), the facility will feature a library integrated throughout the building, state-of-the-art training facilities, spaces for collaborative research, advanced but flexible learning technology, practice courtrooms and a top-floor conference center. By providing a wide array of flexible spaces for small group training, the building efficiently provides more space-per-student, bringing it in line with peer institutions.
 
 
 
All images © VCBO/SMITHGROUP JJR Architecture and the College of Law
 
 
 
“This building will fulfill the educational needs of tomorrow’s lawyers while serving the broader Utah legal community and the community at large,” said Bob Adler, interim dean of the S. J. Quinney College of Law. “We are committed to using the facility in ways that will better prepare skilled attorneys and problem-solving leaders.”
 
The College of Law faculty plans to use the new building to expand its already substantial commitment to community service and community-engaged learning. University of Utah law students provided almost 50,000 hours of volunteer pro bono and clinical service during the 2012-13 academic year. The new building will enable the school to continue this tradition by providing facilities for direct client interaction.
 
The new building is designed to achieve LEED platinum certification, the highest designation using Leadership in Energy and Environmental Design standards and will provide accessibility for a full range of disabilities. Located at the southwest corner of campus across from the Stadium TRAX station, the building will establish a welcoming gateway for visitors to the campus.
 
To date, the building has received generous support from the S.J. and Jessie E. Quinney Foundation, the University of Utah, the Church of Jesus Christ of Latter-day Saints, and the Alternative Visions Fund of the Chicago Community Trust as well as a growing number of law firms and individual donors.
 
 
 
The $4.5 million donation from the Alternative Visions Fund is dedicated specifically to taking the facility’s sustainable features to the next level. Among the attributes made possible through this donation are an innovative cooling system using groundwater from near the building site, recycling and reuse of building grey water to flush toilets and for other non-potable uses, on-site and off-site solar power generation, electric car charging stations and more.
 
Big-D Construction will begin work on the new, 155,000-square-foot building on June 17, and the building is expected to be ready for the 2015-16 academic year.
 
All plans courtesy VCBO Architecture

Related Stories

MFPRO+ News | Jun 24, 2024

‘Yes in God’s Backyard’ movement could create more affordable housing

The so-called “Yes in God’s Backyard” (YIGBY) movement, where houses of worship convert their properties to housing, could help alleviate the serious housing crisis affecting many communities around the country.

Student Housing | Jun 20, 2024

How student housing developments are evolving to meet new expectations

The days of uninspired dorm rooms with little more than a bed and a communal bathroom down the hall are long gone. Students increasingly seek inclusive design, communities to enhance learning and living, and a focus on wellness that encompasses everything from meditation spaces to mental health resources.

Museums | Jun 20, 2024

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 

Building Technology | Jun 18, 2024

Could ‘smart’ building facades heat and cool buildings?

A promising research project looks at the possibilities for thermoelectric systems to thermally condition buildings, writes Mahsa Farid Mohajer, Sustainable Building Analyst with Stantec.

University Buildings | Jun 18, 2024

UC Riverside’s new School of Medicine building supports team-based learning, showcases passive design strategies

The University of California, Riverside, School of Medicine has opened the 94,576-sf, five-floor Education Building II (EDII). Created by the design-build team of CO Architects and Hensel Phelps, the medical school’s new home supports team-based student learning, offers social spaces, and provides departmental offices for faculty and staff. 

Healthcare Facilities | Jun 18, 2024

A healthcare simulation technology consultant can save time, money, and headaches

As the demand for skilled healthcare professionals continues to rise, healthcare simulation is playing an increasingly vital role in the skill development, compliance, and continuing education of the clinical workforce.

Mass Timber | Jun 17, 2024

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

Concrete Technology | Jun 17, 2024

MIT researchers are working on a way to use concrete as an electric battery

Researchers at MIT have developed a concrete mixture that can store electrical energy. The researchers say the mixture of water, cement, and carbon black could be used for building foundations and street paving.

Codes and Standards | Jun 17, 2024

Federal government releases national definition of a zero emissions building

The U.S. Department of Energy has released a new national definition of a zero emissions building. The definition is intended to provide industry guidance to support new and existing commercial and residential buildings to move towards zero emissions across the entire building sector, DOE says.

Multifamily Housing | Jun 14, 2024

AEC inspections are the key to financially viable office to residential adaptive reuse projects

About a year ago our industry was abuzz with an idea that seemed like a one-shot miracle cure for both the shockingly high rate of office vacancies and the worsening housing shortage. The seemingly simple idea of converting empty office buildings to multifamily residential seemed like an easy and elegant solution. However, in the intervening months we’ve seen only a handful of these conversions, despite near universal enthusiasm for the concept. 

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021