Long-time champions of timber construction and Canadian practice Michael Green Architecture will soon break ground on North America's tallest wooden building. Standing at 27.5 meters, the Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely available around the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.
The structure will contain a mezzanine level, classrooms, offices, and a public gallery on the ground floor dedicated to the palpable experience of wood, lounges, and a rooftop deck. Owned by the state, the project will also house the University of Northern British Columbia’s Masters of Engineering program, in addition to private office and public spaces.
The structure will be made almost entirely of wood, save for metal connections and a concrete foundation. Even the elevator core, which is traditionally made in concrete, will be made of thick timber panels whose density and size afford the appropriate fire-rating characteristics. The framing system allows for a greater façade transparency, accepting natural light and extending views with a low-emissivity glass skin and opaque timber screens that help control solar gain. Floor and ceiling slabs will be composed of mass timber panels (MTP) that provide lateral stability in addition to eliminating the need for surface finishes, and provide for many new design opportunities for future wood constructs.
Video walk-through:
http://www.youtube.com/watch?feature=player_embedded&v=S2F3ssM61E0#!
(http://www.designboom.com/architecture/michael-green-architecture-widc-north-americas-tallest-wood-building/)
Related Stories
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.
| Dec 9, 2011
BEST AEC FIRM 2011: Chapman Construction/Design
Taking sustainable practices to heart.
| Dec 9, 2011
BEST AEC FIRMS 2011: EYP Architecture & Engineering
Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.
| Dec 8, 2011
Keast & Hood Co. part of Statue of Liberty renovation team
Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty.
| Dec 8, 2011
HDR opens office in Shanghai
The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia.
| Dec 8, 2011
HOK elevates the green office standard
Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.