Long-time champions of timber construction and Canadian practice Michael Green Architecture will soon break ground on North America's tallest wooden building. Standing at 27.5 meters, the Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely available around the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.
The structure will contain a mezzanine level, classrooms, offices, and a public gallery on the ground floor dedicated to the palpable experience of wood, lounges, and a rooftop deck. Owned by the state, the project will also house the University of Northern British Columbia’s Masters of Engineering program, in addition to private office and public spaces.
The structure will be made almost entirely of wood, save for metal connections and a concrete foundation. Even the elevator core, which is traditionally made in concrete, will be made of thick timber panels whose density and size afford the appropriate fire-rating characteristics. The framing system allows for a greater façade transparency, accepting natural light and extending views with a low-emissivity glass skin and opaque timber screens that help control solar gain. Floor and ceiling slabs will be composed of mass timber panels (MTP) that provide lateral stability in addition to eliminating the need for surface finishes, and provide for many new design opportunities for future wood constructs.
Video walk-through:
http://www.youtube.com/watch?feature=player_embedded&v=S2F3ssM61E0#!
(http://www.designboom.com/architecture/michael-green-architecture-widc-north-americas-tallest-wood-building/)
Related Stories
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Feb 2, 2012
Delk joins Gilbane Building Co.
Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.
| Feb 2, 2012
Next phase of construction begins on Scripps Prebys Cardiovascular Institute
$456 million Institute will be comprehensive heart center for 21st Century.
| Feb 1, 2012
Increase notched in construction jobs, but unemployment rate still at 16%
AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.
| Feb 1, 2012
Replacement windows eliminate weak link in the building envelope
Replacement or retrofit can help keep energy costs from going out the window.
| Feb 1, 2012
‘Augmented reality’ comes to the job site
A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.
| Feb 1, 2012
New ways to work with wood
New products like cross-laminated timber are spurring interest in wood as a structural material.
| Feb 1, 2012
Blackney Hayes designs school for students with learning differences
The 63,500 sf building allows AIM to consolidate its previous two locations under one roof, with room to expand in the future.
| Feb 1, 2012
Two new research buildings dedicated at the University of South Carolina
The two buildings add 208,000 square feet of collaborative research space to the campus.
| Feb 1, 2012
List of Top 10 States for LEED Green Buildings released?
USGBC releases list of top U.S. states for LEED-certified projects in 2011.