Long-time champions of timber construction and Canadian practice Michael Green Architecture will soon break ground on North America's tallest wooden building. Standing at 27.5 meters, the Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely available around the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.
The structure will contain a mezzanine level, classrooms, offices, and a public gallery on the ground floor dedicated to the palpable experience of wood, lounges, and a rooftop deck. Owned by the state, the project will also house the University of Northern British Columbia’s Masters of Engineering program, in addition to private office and public spaces.
The structure will be made almost entirely of wood, save for metal connections and a concrete foundation. Even the elevator core, which is traditionally made in concrete, will be made of thick timber panels whose density and size afford the appropriate fire-rating characteristics. The framing system allows for a greater façade transparency, accepting natural light and extending views with a low-emissivity glass skin and opaque timber screens that help control solar gain. Floor and ceiling slabs will be composed of mass timber panels (MTP) that provide lateral stability in addition to eliminating the need for surface finishes, and provide for many new design opportunities for future wood constructs.
Video walk-through:
http://www.youtube.com/watch?feature=player_embedded&v=S2F3ssM61E0#!
(http://www.designboom.com/architecture/michael-green-architecture-widc-north-americas-tallest-wood-building/)
Related Stories
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.