Long-time champions of timber construction and Canadian practice Michael Green Architecture will soon break ground on North America's tallest wooden building. Standing at 27.5 meters, the Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely available around the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.
The structure will contain a mezzanine level, classrooms, offices, and a public gallery on the ground floor dedicated to the palpable experience of wood, lounges, and a rooftop deck. Owned by the state, the project will also house the University of Northern British Columbia’s Masters of Engineering program, in addition to private office and public spaces.
The structure will be made almost entirely of wood, save for metal connections and a concrete foundation. Even the elevator core, which is traditionally made in concrete, will be made of thick timber panels whose density and size afford the appropriate fire-rating characteristics. The framing system allows for a greater façade transparency, accepting natural light and extending views with a low-emissivity glass skin and opaque timber screens that help control solar gain. Floor and ceiling slabs will be composed of mass timber panels (MTP) that provide lateral stability in addition to eliminating the need for surface finishes, and provide for many new design opportunities for future wood constructs.
Video walk-through:
http://www.youtube.com/watch?feature=player_embedded&v=S2F3ssM61E0#!
(http://www.designboom.com/architecture/michael-green-architecture-widc-north-americas-tallest-wood-building/)
Related Stories
Architects | Jul 19, 2022
Perkins Eastman Bolsters Its Dallas Studio with 5 Dynamic New Principals
Seasoned staff bring talent, experience, and enthusiasm to expand firm.
Energy-Efficient Design | Jul 19, 2022
All is not lost: 3 ways architects can respond to the Supreme Court’s EPA ruling
The U.S. Supreme Court’s ruling to limit the Environmental Protection Agency’s power to regulate greenhouse gas (GHG) emissions from power plants dealt a significant blow to our ability to fight the climate crisis with federal policy.
Office Buildings | Jul 19, 2022
Austin adaptive reuse project transforms warehouse site into indoor-outdoor creative office building
Fifth and Tillery, an adaptive reuse project, has revitalized a post-industrial site in East Austin, Texas.
Women in Design+Construction | Jul 18, 2022
Registration is open for BD+C's 2022 Women in Design+Construction Conference
Join your AEC industry peers in Chicago, September 26-28, 2022, for the 7th annual Women in Design+Construction Conference, hosted by the BD+C editorial team and the 35-person WIDC Advisory Board.
Airports | Jul 18, 2022
FAA will award nearly $1 billion for airport projects
The Federal Aviation Administration (FAA) will award nearly $1 billion to 85 airports of all sizes across the country to improve terminals.
Building Team | Jul 18, 2022
Understanding the growing design-build market
FMI’s new analysis of the design-build market forecast for the next fives years shows that this delivery method will continue to grow, despite challenges from the COVID-19 pandemic.
Mixed-Use | Jul 18, 2022
Mixed-use development outside Prague uses a material made from leftover bricks
Outside Prague, the Sugar Factory, a mixed-used residential development with public space, marks the largest project to use the sustainable material Rebetong.
Building Team | Jul 15, 2022
ABC: Construction materials prices increased in June, up 20% from a year ago
Construction input prices increased 1.9% in June compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics’ Producer Price Index data released today.
Arenas | Jul 15, 2022
U. of Oregon renovation aims for ‘finest track and field facility in the world’
The renovation of the University of Oregon’s Hayward Field had the goal of creating the “finest track and field facility in the world.”
Building Team | Jul 14, 2022
ABC’s construction backlog inches lower in June; Contractor confidence falters
Associated Builders and Contractors reports today that its Construction Backlog Indicator fell 0.1 months in June and stands at 8.9 months, according to an ABC member survey conducted June 21 to July 5.