flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

FIRST LOOK: JetBlue opens sprawling green rooftop at JFK International Airport

Airports

FIRST LOOK: JetBlue opens sprawling green rooftop at JFK International Airport

The 4,046-sf rooftop includes landscaped green spaces, seating for 50 people, 400-sf children’s play area, and a 400-sf dog-walk area.


By Gensler | July 1, 2015

The vegetated rooftop is open to everyone who clears security at the terminal and offers spectacular views of Manhattan and the adjacent TWA Terminal. Photo: © Paúl Rivera, courtesy of Gensler

Today, JetBlue Airways opened the T5 Rooftop atop Terminal 5 at John F. Kennedy (JFK) International Airport in New York. Designed by Gensler, the vegetated rooftop is open to everyone who clears security at the terminal and offers spectacular views of Manhattan and the adjacent TWA Terminal.

In keeping with the vision for all of Terminal 5, the design emphasizes well-being and offers customers unexpectedly delightful places to spend time at the airport. Even traveling pets will enjoy the park, as it boasts the first airside, post-security dog walk area on a rooftop.

The 4,046-sf rooftop includes landscaped green spaces, seating for 50 people, 400-sf children’s play area, and a 400-sf dog-walk area. Unlike other rooftop clubs at U.S. airports, the park is open to all customers who clear security at T5, not just VIPs or “elite-status” flyers.

 

Photo: © Paúl Rivera, courtesy of Gensler

 

“We are New York’s Hometown Airline, so T5 was designed to show off the pride we have for our city. We brought many elements of our city into T5, including the new T5 Rooftop," said Rich Smyth, vice president, corporate real estate, JetBlue.

“Gensler’s design strategy was to look for ways to make the most of moments that travelers take for granted, and part of that is seeking out spaces at the airport that designers typically overlook. The roof park is yet another way to surprise JetBlue customers with fun experiences that you don’t usually have at an airport,” said Gensler architect and Principal Ty Osbaugh.

Also on the Building Team: Arup, Turner Construction, and The Port Authority of New York and New Jersey.

 

Photo: © Paúl Rivera, courtesy of Gensler

Tags

Related Stories

| Jun 14, 2012

Viscardi joins LEO A DALY as VP, corporate director of aviation programs

Viscardi will be responsible for providing the vision and strategy for growing the firm’s aviation practice, identifying and establishing new clients, as well as maintaining existing client relationships.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 30, 2012

Construction milestone reached for $1B expansion of San Diego International Airport

Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| Mar 29, 2012

U.K.’s Manchester Airport tower constructed in nine days

Time-lapse video shows construction workers on the jobsite for 222 continuous hours.

| Mar 27, 2012

Skanska hires aviation construction expert Bob Postma

Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.

| Jan 4, 2012

New LEED Silver complex provides space for education and research

The academic-style facility supports education/training and research functions, and contains classrooms, auditoriums, laboratories, administrative offices and library facilities, as well as spaces for operating highly sophisticated training equipment.

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


Airports

SOM unveils ‘branching’ structural design for new Satellite Concourse 1 at O’Hare Airport

The Chicago Department of Aviation has revealed the design for Satellite Concourse 1 at O’Hare International Airport, one of the nation’s business airports. Designed by Skidmore, Owings & Merrill (SOM), with Ross Barney Architects, Juan Gabriel Moreno Architects (JGMA), and Arup, the concourse will be the first new building in the Terminal Area Program, the largest concourse area expansion and revitalization in the airport’s almost seven-decade history. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021