In a competition to design a "Learning Hub" for students at Nanyang University in Singapore, London-based firm Heatherwick Studio has won with a rounded, hive-like design. The £360 million project has won the BCA Green Mark Platinum Award for Sustainability from the government of Singapore.
The architects said that the design is meant to transcend the original purpose of a university building, redefining the spaces where students collaborate.
Rather than a building principally meant to house educational texts, they sought to design an appealing place for students to work and socialize, given the fact that the Internet makes it possible for educational information to be accessed outside of university buildings.
Fifty-six rooms will be condensed into a space with no conventional corridors, and will center around an area that can be entered from 360 degrees, Arch Daily reports. This central space will link all of the structure's separate towers, which contain classrooms stacked upon one another. Selected floors will also feature gardens.
"Another inspiration for the hub was a wish to break down the traditional, square, forward-facing classrooms with a clear front and hierarchy, and move to a cornerless space, where teachers and students mix on a more equal basis," Heatherwick Studio said in a statement.
"In this model, students work together around shared tables, with teacher as facilitator and partner in the voyage of learning, rather than ‘master’ executing a top-down model of pedagogy."
Heatherwick will work with local architects CPG Consultants to fully realize the Learning Hub. All renderings courtesy of Heatherwick Studio.
Related Stories
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.
| Nov 28, 2011
Armstrong acquires Simplex Ceilings
Simplex will become part of the Armstrong Building Products division.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas
Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Nov 22, 2011
New Green Matters Conference examines emerging issues in concrete and sustainability
High-interest topics will be covered in technical seminars, including infrared reflective coatings for heat island mitigation, innovative uses of concrete to provide cooling and stormwater management, environmental benefits of polished concrete, and advancements in functional resilience of architectural concrete.