Edward P. Evans Hall, the new home of the Yale School of Management, has opened for business. The 242,000-sf facility was designed by Foster + Partners, with Gruzen Samton as architect of record.
The facility includes 16 classrooms, faculty offices, academic centers, and student and meeting spaces around a central courtyard on a 4.25-acre site. The program also includes a 350-seat auditorium, a library, a dining commons, and a coffee shop.
The central courtyard is intended to accommodate studyhing and socializing, with a large amount of exteior glazing helping to promote a unifying effect between indoor and outdoor spaces.
An art installation by Sol LeWitt is a distinctive feature. Yale has released a series of construction videos, as well as the video below, featuring Lord Norman Foster discussing the design.
Other members of the Building Team: Buro Happold (MEP, SE, FP); URS Partnership (CE); Olin Partnership (landscape architect); Claude Engle (lighting design); Arup (AV/IT/security/acoustics); HB Communications (AV consultant); VDA (vertical transportation); Ricca Newmark Design (food service consultant); Dimeo Construction (CM).
The school has released a narrated slideshow featuring some of the images below.
Related Stories
| Mar 7, 2012
Turner appointed Batson-Cook CFO and treasurer
Cecil G. Hood to continue in advisory role.
| Mar 7, 2012
Thornton Tomasetti names Dowdall VP of Kansas City office
Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.
| Mar 7, 2012
LEO A DALY selected to design Minnesota Fallen Firefighters Memorial
The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.
| Mar 7, 2012
Houlihan Lokey adds Steffen to Industrials Group
Steffen bolsters group with experience in the building materials and rorest product sectors.
| Mar 6, 2012
Country’s first Green House home for veterans completed
Residences at VA Danville to provide community-centered housing for military veterans.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago
Construction was completed by Skender in just 12 weeks.
| Mar 6, 2012
BLT Architects promotes two to associate
Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.
| Mar 6, 2012
Joliet Junior College achieves LEED Gold
With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.
| Mar 5, 2012
Tishman constructing new courthouse in Philadelphia
Construction is underway for the Pennsylvania Department of General Services’ 510,000-sf facility.