Edward P. Evans Hall, the new home of the Yale School of Management, has opened for business. The 242,000-sf facility was designed by Foster + Partners, with Gruzen Samton as architect of record.
The facility includes 16 classrooms, faculty offices, academic centers, and student and meeting spaces around a central courtyard on a 4.25-acre site. The program also includes a 350-seat auditorium, a library, a dining commons, and a coffee shop.
The central courtyard is intended to accommodate studyhing and socializing, with a large amount of exteior glazing helping to promote a unifying effect between indoor and outdoor spaces.
An art installation by Sol LeWitt is a distinctive feature. Yale has released a series of construction videos, as well as the video below, featuring Lord Norman Foster discussing the design.
Other members of the Building Team: Buro Happold (MEP, SE, FP); URS Partnership (CE); Olin Partnership (landscape architect); Claude Engle (lighting design); Arup (AV/IT/security/acoustics); HB Communications (AV consultant); VDA (vertical transportation); Ricca Newmark Design (food service consultant); Dimeo Construction (CM).
The school has released a narrated slideshow featuring some of the images below.
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.