Edward P. Evans Hall, the new home of the Yale School of Management, has opened for business. The 242,000-sf facility was designed by Foster + Partners, with Gruzen Samton as architect of record.
The facility includes 16 classrooms, faculty offices, academic centers, and student and meeting spaces around a central courtyard on a 4.25-acre site. The program also includes a 350-seat auditorium, a library, a dining commons, and a coffee shop.
The central courtyard is intended to accommodate studyhing and socializing, with a large amount of exteior glazing helping to promote a unifying effect between indoor and outdoor spaces.
An art installation by Sol LeWitt is a distinctive feature. Yale has released a series of construction videos, as well as the video below, featuring Lord Norman Foster discussing the design.
Other members of the Building Team: Buro Happold (MEP, SE, FP); URS Partnership (CE); Olin Partnership (landscape architect); Claude Engle (lighting design); Arup (AV/IT/security/acoustics); HB Communications (AV consultant); VDA (vertical transportation); Ricca Newmark Design (food service consultant); Dimeo Construction (CM).
The school has released a narrated slideshow featuring some of the images below.
Related Stories
| Mar 12, 2014
AIA gives support to legislation to assist architecture students with debt
The National Design Services Act will give architecture students relief from student loan debt in return for community service.
| Mar 12, 2014
New CannonDesign database allows users to track facility assets
The new software identifies critical failures of components and systems, code and ADA-compliance issues, and systematically justifies prudent expenditures.
| Mar 11, 2014
7 (more) awe-inspiring interior designs [slideshow]
The seven winners of the 41st Interior Design Competition and the 22nd Will Ching Design Competition include projects on four different continents.
| Mar 11, 2014
Freelon Group to join Perkins+Will
The Freelon Group concentrates on museums, libraries, universities and other civic and institutional clients; Perkins+Will plans to incorporate this specialization into their design repertory.
| Mar 10, 2014
Meet Tally – the Revit app that calculates the environmental impact of building materials
Tally provides AEC professionals with insight into how materials-related decisions made during design influence a building’s overall ecological footprint.
Sponsored | | Mar 10, 2014
A high-performance barn
Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.
| Mar 10, 2014
Field tested: Caterpillar’s Cat B15 rugged smartphone
The B15 is billed by Cat as “the most progressive, durable and rugged device available on the market today.”
| Mar 10, 2014
5 rugged mobile devices geared for construction pros
BD+C readers share their most trusted smartphone and tablet cases. The editors select some of their faves, too.
| Mar 7, 2014
Thom Mayne's high-tech Emerson College LA campus opens in Hollywood [slideshow]
The $85 million, 10-story vertical campus takes the shape of a massive, shimmering aircraft hangar, housing a sculptural, glass-and-aluminum base building.
| Mar 7, 2014
Learning from common leadership errors
As a leader in the AEC world, you’ll likely find yourself making certain mistakes over the course of your career. Here are a few common leadership errors that can easily be avoided.