The government of Qatar has released details of Sharq Crossing, a massive infrastructure project designed by Spanish architect Santiago Calatrava. The work in Doha will include three bridges connected by underwater tunnels, spanning 12 km. When complete, the crossing will connect Hamad International Airport to the cultural district of Katara, as well as the central business district. The project will accommodate a people mover system as well as vehicular and pedestrian traffic.
About 8 km of the project is underwater. The three bridges range from 600 to 1,310 meters long.
“Architecture for public works humanizes the natural landscape and serves the community," said Calatrava. "The Sharq Crossing project for Doha is a great opportunity to develop an exceptional and grand piece of public work.”
The most complex of the bridges, West Bay, will include a park accessible by both an elevated walkway and a cableway. Fluor Corporation will manage the program, with construction projected to begin in 2015.
The video and images below give an idea of the scope of this unusual project.
Related Stories
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.