flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: Austin to get first high-rise since 2003

First look: Austin to get first high-rise since 2003

Developer Cousins Properties broke ground on the 29-story Colorado Tower in downtown Austin, Texas, the city's first high-rise building since Cousins' completed the Frost Bank Tower a decade ago.


By BD+C Staff | June 17, 2013
Cousins Properties Inc. has commenced construction on Colorado Tower, a 371,000-sf Class A office development in Downtown Austin, Texas.
 
The 29-story building, designed by Duda/Paine Architects, will be the first high-rise tower built in Austin since Cousins developed Frost Bank Tower in 2003. The formal ground breaking ceremony is scheduled for June 4th.     
 
“We have a long, successful history in Austin and are very excited about the prospects for Colorado Tower,” said Larry Gellerstedt, President and Chief Executive Officer of Cousins. “This building – with its great location and best-in-class amenity package – is particularly well positioned to capitalize on the vibrant market in Austin’s central business district.”
 
Located in the heart of Downtown Austin’s Warehouse District, Colorado Tower will offer a variety of amenities, including a top quality fitness facility and state-of-the-art conference center.  The building is being developed under the Austin Energy Green Building 2 star program and will be substantially complete by December 2014. 
 
Pre-leasing activity has been strong, with two high-profile companies – DuBois, Bryant & Campbell LLP and Scott, Douglass & McConnico LLP – officially committed to the building and several other prospective tenants in active discussions.   
      
Cousins has played a prominent role in the Austin real estate market for more than 20 years, with a list of notable projects including Frost Bank Tower, Palisades West, and the recent acquisition of 816 Congress. 
 
 
 
 
 
 
 

Related Stories

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021