flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First look: Austin to get first high-rise since 2003

First look: Austin to get first high-rise since 2003

Developer Cousins Properties broke ground on the 29-story Colorado Tower in downtown Austin, Texas, the city's first high-rise building since Cousins' completed the Frost Bank Tower a decade ago.


By BD+C Staff | June 17, 2013
Cousins Properties Inc. has commenced construction on Colorado Tower, a 371,000-sf Class A office development in Downtown Austin, Texas.
 
The 29-story building, designed by Duda/Paine Architects, will be the first high-rise tower built in Austin since Cousins developed Frost Bank Tower in 2003. The formal ground breaking ceremony is scheduled for June 4th.     
 
“We have a long, successful history in Austin and are very excited about the prospects for Colorado Tower,” said Larry Gellerstedt, President and Chief Executive Officer of Cousins. “This building – with its great location and best-in-class amenity package – is particularly well positioned to capitalize on the vibrant market in Austin’s central business district.”
 
Located in the heart of Downtown Austin’s Warehouse District, Colorado Tower will offer a variety of amenities, including a top quality fitness facility and state-of-the-art conference center.  The building is being developed under the Austin Energy Green Building 2 star program and will be substantially complete by December 2014. 
 
Pre-leasing activity has been strong, with two high-profile companies – DuBois, Bryant & Campbell LLP and Scott, Douglass & McConnico LLP – officially committed to the building and several other prospective tenants in active discussions.   
      
Cousins has played a prominent role in the Austin real estate market for more than 20 years, with a list of notable projects including Frost Bank Tower, Palisades West, and the recent acquisition of 816 Congress. 
 
 
 
 
 
 
 

Related Stories

Architects | Jul 10, 2018

AEC marketing fundamentals can still have a role in winning new business

In our Internet-fueled world, it’s easy to get distracted by the latest online tools. But the boring stuff is still important, and you don’t want to lose sight of old-school techniques that are just as persuasive now as they were a few decades ago.

Adaptive Reuse | Jul 9, 2018

Work, park, live: Inside Cincinnati’s parking garage turned lifestyle hotel

The Summit hotel and conference center is a converted parking garage that was once a factory.

Architects | Jun 28, 2018

Designing successful maker spaces

The challenge is to design makerspaces that work, spaces that function as a tool for educators to produce better students.

Architects | Jun 27, 2018

Steven A. Lichtenberger joins Leo A Daly as President

He will lead the firm’s global planning, architecture, engineering, and interiors practice worldwide.

Accelerate Live! | Jun 24, 2018

Watch all 19 Accelerate Live! talks on demand

BD+C’s second annual Accelerate Live! AEC innovation conference (May 10, 2018, Chicago) featured talks on AI for construction scheduling, regenerative design, the micro-buildings movement, post-occupancy evaluation, predictive visual data analytics, digital fabrication, and more. Take in all 19 talks on demand.

Building Team | Jun 22, 2018

What owners should know before choosing the design-build project delivery method

Outside of drawing up a well-written contract, owners often overlook a key attribute that can significantly impact the success of a design-build project, writes Skanska’s Julie Hyson.

Architects | Jun 14, 2018

Chicago Architecture Center sets Aug. 31 as opening date

The Center is located at 111 E. Wacker Drive.

Multifamily Housing | Jun 13, 2018

Multifamily visionaries: KTGY’s extraordinary expectations

KTGY Architecture + Planning keeps pushing the boundaries of multifamily housing design in the U.S., Asia, and the Middle East.

| Jun 11, 2018

Accelerate Live! talk: Regenerative design — When sustainability is not enough

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), HMC’s Eric Carbonnier poses the question: What if buildings could actually rejuvenate ecosystems?

| Jun 11, 2018

Accelerate Live! talk: The smart jobsite — Predictive visual data analytics for proactive project controls

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), a trio of experts in predictive visual data analytics presents how design-build giant Clayco has leveraged this technology to achieve production efficiency on several construction sites.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021