flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First large-scale use of perovskite solar cells in office building slated for Poland this year

Codes and Standards

First large-scale use of perovskite solar cells in office building slated for Poland this year

Skanska will integrate the technology into building facades.


By Peter Fabris, Contributing Editor | January 31, 2018

Skanska’s commercial development business unit in Central Eastern Europe says it will be the first developer to cover office buildings with semi-transparent perovskite solar cells on a commercial scale.

Perovskites are crystalline materials that have great potential to replace silicon in solar power generation. Skanska will apply the technology, developed by Saule Technologies, onto its projects in 2018.

This will be a significant milestone towards zero-energy and carbon neutral office buildings, Skanska says. The company says that the stability and water resistance of the modules makes them ideal for the construction industry.

“Our modules are lighter, thinner, and much more design-friendly than the most popular silicon solar cells,” says Olga Malinkiewicz, co-founder and CTO at Saule Technologies. “We may customize the shape, color, and size of the module depending on the needs of the customer and install them wherever there is a free area on the building.”

Related Stories

Codes and Standards | Dec 4, 2018

Action on building codes would spur low-carbon cities

Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.

Codes and Standards | Nov 30, 2018

Best solution to prevent California wildfire disasters: Stop building in places likely to burn

Approach would be unpopular as people attracted to stunning wooded landscapes.

Codes and Standards | Nov 29, 2018

USGBC and BRE form partnership

Two green standards groups will collaborate on standards, platforms, and research.

Codes and Standards | Nov 29, 2018

Parking garages in N.Y. State will have to be inspected every three years

Professional engineer must assess conditions.

Codes and Standards | Nov 28, 2018

To build water-efficient cities, water managers and urban planners must coordinate better

Lack of time and resources, and practitioners not in habit of working together hamper efforts.

Codes and Standards | Nov 26, 2018

All LEED-certified buildings eligible for LEED recertification

Projects must submit 12 months of data demonstrating continued or improved performance.

Codes and Standards | Nov 20, 2018

OSHA publishes updates to crane operator certification requirements

Long-delayed rules accept certifications by type or type and capacity.

Codes and Standards | Nov 19, 2018

Guide offers understanding of elements that create successful multi-floor communal spaces

CTBUH technical document analyzes how to approach tall urban habitat.

Codes and Standards | Nov 16, 2018

2018 International Green Construction Code released

Updated version helps governments streamline code development and adoption.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021