flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First international buildings among 700-plus certified by BOMA 360 Performance Program

First international buildings among 700-plus certified by BOMA 360 Performance Program

Program now in place in 60 global markets


By BD+C Staff | April 18, 2014
The Aon Center in Chicago was first designated a BOMA 360 building in 2010. Phot
The Aon Center in Chicago was first designated a BOMA 360 building in 2010. Photo: Photogal via Wikimedia Commons

In the first quarter of 2014, the Building Owners and Managers Association (BOMA) International certified 66 properties in the BOMA 360 Performance Program for commercial real estate markets across the U.S and, for the first time, abroad. The Hongo Segawa Building in Tokyo and Bankers Hall and the Exchange Tower in Canada were the first such properties to achieve certification outside of the U.S.

The BOMA 360 Program has expanded to nearly 60 markets worldwide. It evaluates commercial properties in six major areas: building operations and management; life safety/security/risk management; training and education; energy; environment/sustainability; and tenant relations/community involvement. Since the program’s inception in 2009, more than 700 commercial properties demonstrating best practices in these areas have earned the BOMA 360 label.

Several surveys and studies have found that buildings with the BOMA 360 label have higher tenant retention and satisfaction scores, higher rental rates, and documented operations and management savings and efficiencies, BOMA says.

(http://www.BOMA-360-Performance-Program-Designates-First-Buildings-in-Canada-and-Japan.aspx)

Related Stories

Office Buildings | Jun 3, 2021

What's next for workplace design?

Balancing personal space and the need for collaboration.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Office Buildings | May 18, 2021

“The Beam” will be Arizona’s first CLT project

RSP Architects designed the building.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

Steel Buildings | Apr 17, 2021

Speed Core wall system is used for the second time in office building in San Jose

The construction method is expected to knock off three months from the project’s schedule.

Office Buildings | Apr 5, 2021

FXCollaborative selected to create new lobby, amenity space for 3 Times Square

FXCollaborative designed the original building in 2001.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021