flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Firestone names 2012 Master Contractor Award Winners

Firestone names 2012 Master Contractor Award Winners

Annual award acknowledges industry’s top roofing professionals.


By By BD+C Staff | March 14, 2012

Even the best designed commercial roofing system needs to be installed with expert skill to ensure long-lasting performance. To that end, Firestone Building Products Company, LLC, recognized 256 of its more than 3,000 licensed roofing contractors throughout the U.S., Canada and Mexico as 2012 Master Contractors. 

Throughout the past year, these esteemed installers upheld Firestone’s high standards for quality roofing system installation and outstanding service to earn this coveted industry distinction. Collectively, the 2012 winners have installed over 220 million square feet of warranted Firestone roofing systems on new construction and reroof applications in the last year.

Established in 1988, the Firestone Master Contractor program annually presents three distinct industry awards to a distinguished group of contractors based on a variety of criteria for quality workmanship and installation excellence:

Master Contractor Award

The Master Contractor Award recognizes first-rate Firestone-licensed contractors for the total square footage of quality roofing systems installed and Quality Points accumulated for receiving outstanding inspection ratings on Firestone Red Shield warranted RubberGard EPDM, UltraPly TPO, UNA-CLAD metal and asphalt-based roofing system installations. 

Inner Circle of Quality Award

Installers are eligible for the Inner Circle of Quality award by achieving 2012 Master Contractor status, installing a minimum of four warranted Firestone roofs in each of the last five years, maintaining at least 2 million square feet of Firestone roofs under warranty and achieving an annual Quality Incidence Rating (QIR) of 2.0 or less.  The Firestone QIR measures each contractor’s quality performance based on warranty repair incidences per million square feet under warranty.

President’s Club Award

The President’s Club Award distinguishes Master Contractors that have accrued the highest number of Quality Points for superior inspection ratings and total square footage of Firestone Red Shield warranted roofing system installations completed over the past year.

Firestone bestowed the prized Inner Circle of Quality Award to 170 firms and the prestigious President’s Club Award to 31 firms during an awards ceremony held in Waikoloa, Hawaii earlier this year. BD+C

Related Stories

| Jan 31, 2012

Skanska USA Civil promotes Bradley to southeast general superintendent

In Bradley’s new position, he will manage field operations for all Skanska Civil projects in the southeast.

| Jan 30, 2012

Siemens and Air-Ex Team deliver building controls training to Mt. San Antonio College students

Siemens contributes training modules and technology to support hands-on courses.

| Jan 30, 2012

Hollister Construction Services to renovate 30 Montgomery Street in Jersey City, N.J.

Owner Onyx Equities hires firm to oversee comprehensive upgrades of office building.

| Jan 27, 2012

Caterpillar reports record sales and profit for 4Q and full-year 2011

Momentum carries into 2012 with sales and revenues outlook raised to $68 to $72 billion.

| Jan 27, 2012

Smith Seckman Reid opens two new offices

Smith Seckman Reid, Inc. (SSR), an engineering design and facility consulting firm, has opened two new offices, one in Chicago, the other in Washington, D.C.

| Jan 27, 2012

BRB Architects designs new campus center for Molloy College

Intended to be the centerpiece of the College’s transformation from a commuter college to a 24-hour learning community, the “Public Square” will support student life with spaces such as a café, lounges, study rooms, student club space, a bookstore and an art gallery.

| Jan 27, 2012

Columbia University’s New Core Laboratory aims for LEED Silver

Construction manager Sordoni Construction Co. along with the design team of Payette Architects and Vanderweil Engineers will provide design and construction services to renovate the majority of the existing Core Lab building to create the new Lamont Center for Bio-Geochemistry.

| Jan 26, 2012

Three dead, 16 missing in Rio buildings collapse

The buildings, one 20 floors high, collapsed on Wednesday night in a cloud of dust and smoke just one block away from the city's historic Municipal Theater.

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection. 

| Jan 26, 2012

Hendrick Construction completes Osso Restaurant in Charlotte

Designed by François Fossard, Osso's upscale interior includes tapered, twisted decorative columns and an elegant fireplace in the center of the lounge. 

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021